My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 7200 - 35 <br /> I <br /> by the Contractor in reasonable anticipation of performing the Work that has been deleted or <br /> terminated; <br /> 4. The total payment for any one item in the case of a deletion or partial termination shall not exceed <br /> the Bid price as modified by approved Change Orders less the estimated cost,including Overhead <br /> and profit,to complete the Work and less any amount paid to the Contractor for the item; <br /> 5. If the entire remainder of the Contract is terminated,the total payment to the Contractor shall not <br /> exceed the total Contract Sum as modified by approved Change Orders less those amounts paid to <br /> the Contractor before the effective date of the termination; and <br /> 6. No claim for damages of any kind or for loss of anticipated profits or consequential damages on <br /> deleted or terminated Work will be allowed because of termination or Change Order.Contract <br /> Time shall be adjusted as the parties agree.If the parties cannot agree,the Owner's <br /> Representative will determine the adjustment of Contract Time. <br /> Acceptable materials ordered by the Contractor prior to the date the Work was terminated or deleted will <br /> either be purchased from the Contractor by the Owner at the actual cost and shall become the property of <br /> the Owner,or the Owner will reimburse the Contractor for the actual costs of returning these materials to <br /> the Suppliers. <br /> If Contractor disagrees with the adjustment of Contract Sum determined by the Owner's Representative, <br /> Contractor may submit a Contract Claim for the difference between the amount determined by the <br /> Owner's Representative and the amount sought by the Contractor. <br /> Contractor shall not be entitled to anticipated profits on deleted,terminated,or uncompleted Work. <br /> 9.3. CHARGES TO CONTRACTOR <br /> The Contractor shall pay the Owner on demand everything charged to it under the terms of this Contract. <br /> Such charges may be deducted by the Owner from money due or to become due to the Contractor under <br /> the Contract. The Owner may recover such charges from the Contractor or from its surety. <br /> Contractor agrees to pay the costs of overtime or excessive inspection and observation costs incurred by <br /> the Owner. Overtime inspection shall include inspection required during Saturdays, Sundays,City <br /> holidays and weekdays,in excess of 40 hours per week or outside of normal working hours and <br /> inspections or observations that result in an inspector or observer working more than forty hours in a <br /> week. Costs of such overtime or excessive inspection or observation include architecture,engineering, <br /> construction management services,inspection,general supervision and Overhead expenses which are <br /> directly chargeable to the overtime or excessive work.Contractor agrees that Owner will deduct such <br /> charges from payments due the Contractor.In the event the Owner by Change Order requires the <br /> Contractor to work in excess of the established schedule of working hours,the Owner will not charge the <br /> Contractor for inspection costs associated therewith. <br /> 9.4. COMPENSATION TO OWNER FOR TIME EXTENSION <br /> The Owner shall be compensated by the Contractor for the actual costs to the Owner of engineering, <br /> inspection,general supervision,right-of-way costs,permit fees,Overhead expenses,and any other <br /> ascertainable direct costs to the Owner that are directly chargeable to the Work and which accrue during <br /> the period of such extension. The actual costs do not include charges for final inspection and preparation <br /> of the fmal payment by the Owner. <br /> 9.5. ADJUSTMENT OF CONTRACT SUM <br /> 9.5.1 Calculation <br /> Except as otherwise expressly provided in these General Conditions,any and all adjustments of Contract <br /> Sum shall be determined as follows: <br /> 1. If the parties are able to agree,the price will be determined by using: <br /> 00 7200 - 35 GENERAL CONDITIONS <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.