Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 48 <br /> I <br /> 4. The Contractor's Overhead costs did not materially vary from its usual seasonal Overhead costs <br /> during the period of delay;and I <br /> 5. The Delay did not cause Overabsorbed Overhead in the period in which the delayed Work was <br /> completed. <br /> 12.4.3.5.2.1 Resources 1 <br /> To demonstrate the Contractor could not and did not use resources, including but not limited to <br /> labor,materials and equipment from this Project for any other work on this or any other project <br /> during the period of delay(12.4.3.5.2.(3)),the Contractor must: <br /> a. Affirmatively represent and warrant that it did not perform substitute Work; <br /> b. Identify the specific resources that were idled; and <br /> c. Show that those resources did not,and could not,work on other contracts or projects during <br /> the Delay. <br /> 12.4.3.5.2.2 No Material Variations I <br /> To demonstrate the Contractor's Overhead costs did not materially vary from its usual seasonal <br /> Overhead costs during the period of delay(12.4.3.5.2.(4)),the Contractor must; <br /> a. Affirmatively represent and warrant that the completion of the subject Work was extended <br /> and that such extension prevented the performance of other work during both the period of <br /> delay and the later period of time required to complete the extended Work, <br /> b. Disclose the details of Contractor generated billings and Contractor Overhead Costs(as <br /> hereinafter defined)throughout the actual project performance. The details of such <br /> information should be no less than specific identification of the sources and amounts of <br /> revenue on no greater than a monthly basis and specific identification of the types and <br /> amounts of Contractor Overhead Costs on no greater than a monthly basis for the actual <br /> Project duration. <br /> 12.4.3.5.2.3 Overabsorbed Overhead , <br /> To demonstrate that it did not incur Overabsorbed Overhead in the period following the Delay <br /> (12.4.3.5.2.(5)),the Contractor must: <br /> a. Affirmatively represent and warrant that completion of the delayed Work prevented the <br /> performance of other work; <br /> b. Identify the critical resource unavailable for other work due to completion of the delayed <br /> Contract; and <br /> c. Showing that unavailability of this critical resource precluded the performance of other work. <br /> 12.4.4 Inefficiencies I <br /> 12.4.4.1 Adjustment of Contract Sum <br /> To the extent Contractor is entitled to an increase in Contract Sum because of inefficiencies or impaired <br /> productivity,then compensation due,if any,shall be calculated as provided in 9.5.ADJUSTMENT OF <br /> CONTRACT SUM. There is no entitlement to increase in Contract Sum for inefficiencies related to a <br /> Third Party or to a Force Majeure Event. <br /> 12.4.4.2 Adjustment of Contract Time I <br /> To the extent Contractor is entitled to an extension of Contract Time because of inefficiencies or impaired <br /> productivity,then the time extension,if any, shall be determined as provided in 5.2.2.2 Extensions of <br /> Contract Time. ' <br /> I <br /> 00 7200 - 48 GENERAL CONDITIONS <br />