My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 73 43 - 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 00 73 43 -WAGE RATE REQUIREMENTS <br /> PART 1 -GENERAL <br /> 1.1 SPECIFICATION REFERENCE <br /> A. Section 00 72 00—GENERAL CONDITIONS, Part 7.1 "Wages of Employees". <br /> 1.2 WORK LOCATION <br /> A. All Work performed within Snohomish County, WA. <br /> 1.3 PREVAILING WAGE REQUIREMENTS <br /> A. Contractor agrees to comply with all state and federal laws relating to the employment <br /> of labor and wage rates to be paid. The hourly wages to be paid to laborers, workers, or <br /> mechanics shall be not less than the prevailing rate of wage for an hour's work in the <br /> same trade or occupation in Snohomish County. <br /> 1. Washington State Prevailing Wage Rates for Snohomish County, effective <br /> 2/1/2023; Benefit Code Key, effective 2/1/2023 are, by reference, made a part of <br /> this Contract. <br /> 2. Prevailing wage rates can be accessed at the following URL: <br /> http://www.Ini.wa.gov/TradesLicensing/PrevWage/WageRates/default.asp <br /> 3. Printed copies of the current prevailing wage forms are available upon request. <br /> B. In the preparation of its Bid, based on these Specifications, the Bidder is solely <br /> responsible to <br /> 1. Use the schedule in effect at the Bid Opening Date and time, <br /> 2. Determine the appropriate labor classification(s); and <br /> 3. Utilize the appropriate and correct prevailing wage and benefit rate(s). <br /> C. No payment will be made on this Contract until the Contractor and each Subcontractor <br /> has submitted a "Statement of Intent to Pay Prevailing Wages", form F700-029-000, <br /> which has been approved by the industrial statistician of the Department of Labor and <br /> Industries. <br /> D. No final payment or release of retainage will be made until the Contractor and each <br /> Subcontractor has submitted an "Affidavit of Wages Paid", form F700-007-000, which <br /> has been certified by the industrial statistician of the Department of Labor and Industries. <br /> E. Post the prevailing rate of wage statement in a location readily visible to workers at the <br /> job site, or as allowed by RCW 39.12.020. The "Statement of Intent to Pay Prevailing <br /> Wages" shall include: <br /> 1. Contractor's registration certificate number and <br /> 00 73 43 - 1 WAGE RATE REQUIREMENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.