My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 33 00- 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 01 33 00 -SUBMITTAL PROCEDURES <br /> PART 1 -GENERAL <br /> 1.1 DESCRIPTION <br /> A. To ensure that the specified products are furnished and installed in accordance with the <br /> design intent, procedures have been established for advance submittal of design data <br /> and for its review by the Architect/Engineer. <br /> B. Electronic submittals of shop drawings or other documents required for approval may be <br /> substituted for paper copies. Electronic submittals must be submitted utilizing current <br /> Adobe Software or as otherwise approved by Owner. All electronic submittals shall be <br /> certified documents and digital signed showing Contractor's review, and stamp showing <br /> approval of submittal. All electronic submittals shall book marked. A table of contents <br /> is required and shall be placed directly behind the cover page. Document properties shall <br /> include the Job Name, Division (Section Number), and items included in submittal.Prior <br /> to use of Electronic submittals, discuss with Owner, procedures and formatting including <br /> any additional contents to be included within the document. <br /> C. Related Work: <br /> 1. For individual submittals required, refer to the pertinent sections of these <br /> specifications. <br /> 2. Section 00 72 00-2.4 <br /> 3. Make all submittals required by the Contract Documents, revise and resubmit as <br /> required to establish compliance with the specified requirements. <br /> 4. Wherever possible throughout the Contract Documents, the minimum acceptable <br /> quality of workmanship and materials has been defined by manufacturer's <br /> description of required attributes and performance. <br /> 1.2 PRODUCT HANDLING <br /> A. Make all submittals of shop drawings, samples, requests for substitution, and other <br /> similar items in strict accordance with the provisions of this section of the specifications. <br /> PART 2 - PRODUCTS <br /> 2.1 SHOP DRAWINGS <br /> A. Unless otherwise specifically directed otherwise, format all shop drawings to be <br /> formatted to fit on 11" x 17" size paper. Make all shop drawings accurately to a scale <br /> sufficiently large enough to show all pertinent features of the item and its method of <br /> connection to the work. <br /> 01 33 00- 1 SUBMITTAL PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.