Laserfiche WebLink
City of Everett 00 25 13 -2 <br /> Inductive Charging Infrastructure for Everett Transit <br /> I. Due to COVID-19 and in adherence to Mayor Franklin's Directive and Governor <br /> Inslee'sOrder, Contractors will be allowed to enter the construction site keeping <br /> within the socialdistance guidelines for outdoors. <br /> 1.6 ADDENDA <br /> A. All addenda released are required to be signed and attached to the bid proposal. <br /> B. Bids proposals with addenda that are not signed shall be considered non-responsive and <br /> the bid will be rejected. <br /> C. Questions received during the walk thru shall be emailed to Electrical Engineer <br /> consultant and City of Everett Representative and answered as addenda. <br /> D. All other questions or interpretations must be in writing and received by the city no later <br /> than 7 calendar days prior to the bid opening date. <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) <br /> END OF SECTION 00 25 13 <br /> 00 25 13 -2 PRE-BID MEETING <br />