My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 55 00 - 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 01 55 00 -VEHICULAR ACCESS AND PARKING <br /> PART 1 -GENERAL <br /> 1.1 DESCRIPTION <br /> A. Provide labor, signs, and other traffic control devices, for performing traffic control <br /> procedures needed for the protection of the Work and the Public. <br /> 1.2 RELATED REQUIREMENTS <br /> A. Not Applicable <br /> 1.3 REFERENCES <br /> A. MUTCD - Manual on Uniform Traffic Control Devices for Streets and Highways City of <br /> Everett Design and Construction Standards (current edition) <br /> 1.4 CONSTRUCTION UNDER TRAFFIC <br /> A. The Contractor shall be responsible for first aid; the safety, efficiency, and adequacy of <br /> the Contractor's plant, Equipment, and method of construction; and for any damage or <br /> injury resulting from the failure, improper maintenance, use or operation of such plant or <br /> Equipment or method of operation. <br /> B. Notifications Relative to Contractor's Activities: <br /> 1. The Contractor shall plan and schedule Contractor work activities to conform to <br /> and allow time for notifications, approvals, reviews, and other conditions of the <br /> Contract Documents. <br /> a. For Work That Partially or Completely Restricts Any Arterial, Street, <br /> Sidewalk, or Alley <br /> b. Disruptions to, or service modification requests for, Everett transit service <br /> c. Property access restrictions <br /> d. Emergency Work for Pavement or Sidewalk Problems <br /> C. The Contractor shall: <br /> 1. Conduct all operations with the least possible obstruction and inconvenience to the <br /> public. <br /> 2. Have under construction no greater length or amount of work than can be <br /> continuously and vigorously prosecuted properly with due regards to the rights of <br /> the public. <br /> 3. To the extent possible, finish each section before beginning work on the next. <br /> 4. Minimize the disruption of public traffic by: <br /> 01 55 00 - 1 VEHICULAR ACCESS AND PARKING <br />
The URL can be used to link to this page
Your browser does not support the video tag.