My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 55 00-3 <br /> Inductive Charging Infrastructure for Everett Transit <br /> h. Keeping existing traffic signal and lighting systems in operation as the Work <br /> proceeds. (The Owner will continue the routine maintenance on such <br /> systems.) <br /> 5. Protect the rights of abutting property owners by: <br /> a. Planning and conducting construction operations so that the least <br /> inconvenience as possible is caused to abutting property owners; <br /> b. Except during those urgent stages of construction when it is impractical to <br /> carry on the construction and maintain traffic simultaneously, maintaining <br /> ready and convenient access to driveways, houses, and buildings along the <br /> line of Work; <br /> c. The Contractor shall post signs and barricades advising Street closure at the <br /> nearest intersections away from the closed portion of the Street and on all <br /> cross Streets. Street closings shall not exceed 2 blocks in length at any one <br /> time unless approved otherwise by the Owner. <br /> d. When Street closure is required in the preparation of the Roadway for <br /> placement of asphalt pavement, concrete pavement, sewer excavation, or <br /> other construction that prohibits safe vehicular traffic, abutting property <br /> owners and tenants shall be notified 10 days in advance of any restrictions <br /> that might affect access to their property. <br /> e. Providing temporary approaches to crossing or intersecting roads and <br /> keeping those approaches in good condition; and <br /> f. Providing another access before closing an existing one whenever the <br /> Contract calls for removing and replacing an abutting owner's access. The <br /> existing access shall not be closed until the replacement access facility is <br /> available; and <br /> g. Access to Private Properties <br /> 1) The Contractor shall maintain access for local vehicular and <br /> pedestrian traffic to private properties along the line of Work except: <br /> a) During those urgent stages of construction when it is impractical <br /> to carry on the construction and maintain vehicular and <br /> pedestrian traffic simultaneously, or <br /> b) When Street closure is required because construction will <br /> prohibit safe vehicular traffic. <br /> 2) If a Street or alley is to be closed,the Contractor shall notify all abutting <br /> property owners and tenants of the closures or of any other restrictions <br /> that may interfere with their access. <br /> 3) Notification shall be at least 2 days in advance for residential property, <br /> and at least 5 days s in advance for commercial property. <br /> 6. When traffic must pass through grading areas, the Contractor shall: <br /> a. Make cuts and fills that provide a smooth, even Roadbed; <br /> b. Place, in advance of other grading work, enough fill at all Culverts and <br /> bridges to permit traffic to cross; <br /> c. Make Roadway cuts and fills, if ordered by the Owner, in partial width lifts, <br /> alternating lifts from side to side to permit traffic to pass on the side opposite <br /> the Work; <br /> d. Install Culverts on half the width of the Traveled Way, keeping the other half <br /> open to traffic and unobstructed until the first half is ready for use; <br /> 7. After rough grading or placing any subsequent layers: <br /> a. Prepare the final Roadbed to a smooth, even surface (free of humps and <br /> dips) suitable for use by public traffic; and <br /> b. Settle dust with water, or other dust palliative, as the Owner may order. <br /> 01 55 00 - 3 VEHICULAR ACCESS AND PARKING <br />
The URL can be used to link to this page
Your browser does not support the video tag.