My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 55 00 - 5 <br /> Inductive Charging Infrastructure for Everett Transit <br /> A. When the Work area encroaches upon a sidewalk, walkway or crosswalk area, special <br /> consideration must be given to pedestrian safety. Maximum effort must be made to <br /> separate pedestrians from the Work area. <br /> B. Protective barricades, fencing, and bridges, together with warning and guidance devices <br /> and signs, shall be utilized so that the passageway for pedestrians is safe and well <br /> defined. Whenever pedestrian walkways are provided across excavations, they shall be <br /> provided with suitable handrails. Footbridges shall be safe, strong, and free of bounce <br /> and sway, have a slip resistant coating, and be free of cracks, holes, and irregularities <br /> that could cause tripping. Ramps shall be provided at the entrance and exit of all raised <br /> footbridges, again to prevent tripping. Adequate illumination and reflectorization shall be <br /> provided during hours of darkness. All walkways shall be maintained at least 4 feet clear <br /> width except in areas of unusually heavy pedestrian traffic such as business districts, <br /> where the minimum clear width shall be 8 feet. <br /> C. Where walks are closed by construction, an alternate walkway shall be provided, <br /> preferably within the planting strip. Where it is necessary to divert pedestrians into the <br /> Roadway, barricading or channeling devices shall be provided to separate the pedestrian <br /> walkway from the adjacent vehicular traffic lane. At no time shall pedestrians be diverted <br /> into a portion of a Street used concurrently by moving vehicular traffic. <br /> D. At locations where adjacent alternate walkways cannot be provided, appropriate signs <br /> shall be posted at the limits of construction and in advance of the closure at the nearest <br /> crosswalk or intersection to divert pedestrians across the Street. <br /> E. Physical barricades shall be installed to prevent visually impaired people from <br /> inadvertently entering a closed area. Pedestrian walkways shall be wheelchair <br /> accessible at all times. Pedestrian access shall be maintained to all properties adjacent <br /> to the construction site. <br /> 1.6 TEMPORARY TRAFFIC CONTROL <br /> A. General <br /> 1. Installation and maintenance of temporary traffic control for pedestrian and <br /> vehicular traffic within the public Right of Way shall be performed in accordance <br /> with the "Manual on Uniform Traffic Control Devices for Streets and Highways" <br /> (MUTCD)as supplemented by the current edition of the City of Everett Design and <br /> Construction Standards and such additional requirements as may be included in <br /> the Contract. The Manual on Uniform Traffic Control Devices for Streets and <br /> Highways" may be obtained from the Superintendent of Documents, U. S. <br /> Government Printing Office, Washington, D.C. 20402. <br /> 2. The Contractor shall: <br /> a. Provide flaggers, signs, and other traffic control devices not otherwise <br /> specified as being furnished by the Owner <br /> b. Not work on or adjacent to any Traveled Way until all necessary signs and <br /> traffic control devices are in place <br /> c. Unless the section of Street is to be completely closed to vehicular traffic, <br /> schedule and plan the Work to permit: <br /> 1) The maximum number of traffic lanes normally available to be opened <br /> in the direction of the heaviest flow of traffic during the peak hours <br /> 01 55 00 - 5 VEHICULAR ACCESS AND PARKING <br />
The URL can be used to link to this page
Your browser does not support the video tag.