My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 55 00 - 7 <br /> Inductive Charging Infrastructure for Everett Transit <br /> b. Coordinating all traffic control operations, including those of Subcontractors, <br /> Suppliers, and any adjacent construction or maintenance operations <br /> c. Coordinating the Project's activities (Road closures, and lane closures)with <br /> appropriate police, fire control agencies, city or county engineering, medical <br /> emergency agencies, school districts, disposal companies, and transit <br /> companies <br /> d. Overseeing all requirements of the Contract that contribute to the <br /> convenience, safety, and orderly movement of vehicular and pedestrian <br /> traffic <br /> e. Having the latest adopted edition of the MUTCD Manuel and applicable <br /> standards and Contract available at all times on the Project <br /> f. Attending all Project meetings where traffic management is discussed <br /> 3. Contractor's Refusal or Failure to Act: <br /> a. Upon failure or refusal of the Contractor to comply with the Owner's Written <br /> Notice to: <br /> 1) Provide adequate flaggers, <br /> 2) Provide, erect, maintain, and remove, as applicable, barricades, signs, <br /> lights, on site or off site detours or detour bridges, or <br /> 3) Provide any work required by Article 1.02 and Article 1.03 of this <br /> section. <br /> 4) Follow the Engineer's order to do 1), 2), or 3), the Engineer shall have <br /> the option to do one or any combination of the following: <br /> a) Suspend the Work without further notice to the Contractor or the <br /> Contractor's Surety until the Contractor complies with the <br /> Owner's order <br /> b) Immediately provide an off-duty uniformed police officer at no <br /> additional cost to the Owner, or <br /> c) Provide, erect, maintain and remove barricades, signs andlights <br /> at no additional cost to the Owner, by Owner's forces or byothers, <br /> and <br /> d) Deduct all costs related to items 1), 2), or 3) from any progress <br /> payments due or coming due the Contractor. <br /> b. The above options shall not bar the Owner from exercising other remedies <br /> because of the Contractor's failure or refusal to comply with a contractual <br /> obligation. <br /> 4. Traffic Control Plans: <br /> a. Content and Submittal Requirements <br /> 1) Based on the Contractor's intended method of performing the Work, <br /> the Contractor shall develop, adopt, and submit to the Owner a specific <br /> traffic control plan or plans for protecting and controlling pedestrian <br /> and vehicle traffic during construction operations. A separate Traffic <br /> Control Plan is required for each work location within the Street Right <br /> of Way. Typical plans may be submitted for areas with identical traffic <br /> requirements. Typical plans shall be clearly labeled to indicate all <br /> locations the plan is to represent. Traffic control plans shall take into <br /> consideration any Street and lane closure or other restrictions that may <br /> be specified in the Contract. <br /> 2) Submittal shall be made at least 15 Working Days before planned <br /> implementation. The Contractor shall not begin Work in the Street <br /> Right of Way until an approved Traffic Control Plan for the specific <br /> location has been returned by the Owner. Submittal shall be in <br /> 01 55 00 - 7 VEHICULAR ACCESS AND PARKING <br />
The URL can be used to link to this page
Your browser does not support the video tag.