Laserfiche WebLink
City of Everett 01 55 00 - 14 <br /> Inductive Charging Infrastructure for Everett Transit <br /> c. Any detour proposed by the Contractor shall not be built until the Owner <br /> approves. Surfacing and paving shall be consistent with traffic requirements. <br /> D. Measurement <br /> 1. Measurement for"Maintenance and Protection of Traffic Control" shall be part of <br /> the Lump Sum Base Bid price. <br /> E. Payment <br /> 1. Compensation for the costs necessary to complete the work described in this <br /> Section will be made as part of the Lump Sum Base Bid price to include the <br /> following: <br /> a. Maintenance and Protection of Traffic Control <br /> b. Traffic Control Labor, <br /> c. Construction Signs Class A, <br /> d. Construction Signs Class B. <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) <br /> END OF SECTION 01 55 00 <br /> 01 55 00 - 14 VEHICULAR ACCESS AND PARKING <br />