Laserfiche WebLink
City of Everett 01 72 29- 7 <br /> Inductive Charging Infrastructure for Everett Transit <br /> D. Patch miscellaneous holes, gouges, scrapes, penetrations and other damaged surfaces <br /> on existing construction. <br /> E. Patch using durable materials and methods, suitable to physical characteristics, <br /> tolerances, and expansion coefficients of materials being patched. Where feasible, <br /> inspect and test patched areas to verify integrity of installation. <br /> F. Where cutting and removing of existing material results in uneven finished surfaces, <br /> perform work as necessary to establish even, uniform surface of same color and pattern <br /> as original work. Where this is impractical, verify with Architect and proceed as directed. <br /> G. Where patch cannot be made invisible at a continuous surface, prepare and extend final <br /> finish over to next natural break in surface, including wall and floor lines, wall corner <br /> edges, and wall and ceiling intersections. <br /> 1. Restore exposed finishes of patched areas and extend finish restoration into <br /> adjoining areas to eliminate evidence of patching and refinishing. <br /> 2. Where patching occurs at painted surface, extend paint finish coating over entire <br /> unbroken surface. Recoat as necessary to conform to appearance requirements <br /> of Section 09 9000. <br /> 3. Restore feature strips and other visual elements original condition existing prior to <br /> cutting and patching. <br /> H. Where removal of walls and partitions extends one finished area into another, patch and <br /> repair floor and wall surfaces in new space, provide an even transition of uniform surface, <br /> color, and appearance. Include removal and replacement of wall and floor finishes and <br /> coverings. <br /> 1. Patch, repair, and reinstall existing ceilings and associated mechanical and <br /> electrical work as necessary to make flat and level surfaces of uniform <br /> appearance. <br /> 2. Refinish entire housing and finished surfaces for pieces of exposed equipment to <br /> make uniform in appearance. <br /> I. Patch to maintain fire-resistive construction at construction joints, voids, openings, and <br /> penetrations in conformance to Section 07 84 00. <br /> 3.6 SURFACES COATED WITH LEAD-BASED PAINT <br /> A. Refer to Section 01 35 44 and Drawing HZ1 for information on surfaces known to be <br /> coated with lead-based paint. <br /> 3.7 ADJUSTING <br /> A. Make repairs or replace cutting and patching work not conforming to specified <br /> requirements. <br /> B. Repair damage to work resulting from work of this Section, as directed by Architect. <br /> Reimburse Owner for damage to original construction, deducted from Contract Sum. <br /> 01 72 29- 7 CUTTING AND PATCHING <br />