My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 78 23-2 <br /> Inductive Charging Infrastructure for Everett Transit <br /> 2. Maximum ring size: As suitable to content, 3 inch maximum. Minimum ring size: <br /> one inch. <br /> 3. When multiple binders are used, correlate data into related groupings. <br /> I. Cover - identify the front cover (and each volume in case of multi-volume manual) with <br /> typed title: "Fire Administration Building Tenant Improvements" - Operating and <br /> Maintenance Manual". Label volumes as 1 of 4, 2 of 4, 3 of 4, etc. The front cover shall <br /> show: Title of Project, names of the Consultant, Contractor, appropriate Mechanical, <br /> Electrical or other prime Subcontractor(s), and the date of Physical Completion. Show <br /> the CIP Project number, Public Works Permit Number, and other information as needed. <br /> The spine shall show: Name of the project, identity of the volume if more than one and <br /> the general subject matter covered in the Manual, and the year the project was <br /> completed. <br /> 1.5 CONTENTS <br /> A. Title Page - provide the title of the Project, name of the Project Manager, names <br /> addresses, telephone numbers of the, Consultant, major sub-consultants, General <br /> Contractor, major sub-contractors, and date of Physical Completion. <br /> B. Table of Contents - provide a complete table of contents listing major sections of the <br /> Manual and clearly identifying categories of information in each section. <br /> C. Letter of Physical Completion <br /> D. Warranty List noted in 1.03 listed above. <br /> E. Preventative Maintenance Schedule. <br /> F. Body of Manual - shall be in the Construction Specification Institute (CSI) Format. <br /> 1. Divisions 2 through 14: <br /> a. Bind all product data, product maintenance data, and warranty information <br /> together for each product listed. All products and systems that could require <br /> replacement during the 40-year life of this project must be covered in this <br /> manual. <br /> b. Product Data: <br /> 1) Product Data-submit original product literature only. Mark each sheet <br /> to clearly identify specific products and component parts and data <br /> applicable to installation. Modify product data as required to accurately <br /> represent completed installation. Delete inapplicable information. <br /> 2) Products,Applied Materials and Finishes-include all product data with <br /> catalog number, size, composition, and color and texture designations. <br /> Provide all necessary information for re-ordering custom manufactured <br /> items. Note: For all painting work, provide a complete finish schedule <br /> of products, color names and numbers, formulas, and gloss used. <br /> Provide a drawing showing all paint and color locations. <br /> 3) Moisture Protection and Weather Exposed Products- include product <br /> data listing applicable reference standards, chemical composition, and <br /> 01 78 23-2 OPERATION AND MAINTENANCE DATA <br />
The URL can be used to link to this page
Your browser does not support the video tag.