My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 78 36-2 <br /> Inductive Charging Infrastructure for Everett Transit <br /> (date of Physical Completion), and will repair, or replace, without delay, any defects in <br /> materials or workmanship, and associated damage discovered within the warranty <br /> period by replacing the defective material and or equipment at no cost to the Owner. <br /> Sincerely, <br /> (Name of Contractor/responsible principal/address/telephone number): <br /> Signed by Principal, Partner, or other person authorized to commit firm. <br /> 1.5 SUBMITTAL REQUIREMENTS: <br /> A. Submit one (1) hard cover binder with originals of each extended warranty and service <br /> and maintenance contracts specified in respective specification sections of the Project <br /> Manual to the Owner for their review and approval. Binder shall match the O&M Manual <br /> binders in Section 01 78 23. Submit Approved binder and contents with the Approved <br /> O&M Manuals prior to application for final payment. <br /> 1.6 WARRANTY PROVISIONS: <br /> A. The bonded warranty period for the Contractor extends for one year from the date of the <br /> Certificate of Completion. <br /> B. In the event of failure of any part of the Work during the warranty period, repair or remove <br /> and replace the defective components, including repair/replacement of any overlying or <br /> dependent construction, at no additional charge to the Owner. <br /> C. Repair and replacements shall be completed in accordance with all the requirements of <br /> the Contract Documents. Repaired or replaced work shall be an exact match for original <br /> work unless otherwise approved in writing by the Owner. <br /> D. In the event of repeated failure of any repaired component, or if the Owner is not satisfied <br /> that the quality of repairs meets the requirements of the Contract Documents,the Owner <br /> may order defective work completely removed and replaced with new. <br /> E. The Owner shall schedule a warranty inspection of all work completed under the Contract <br /> within one year of the date of the Certificate of Completion. The Owner shall establish <br /> the date, time and place for the warranty inspection and notify the Contractor to send <br /> representatives. The Owner and the Contractor shall identify valid warranty defects and <br /> prepare a warranty inspection list consisting of the items to be corrected. The Contractor <br /> and or Contractors Subcontractors shall correct and or replace the defective items or <br /> workmanship in a reasonable time, not to exceed two (2) months time. Failure of the <br /> Contractor to correct agreed upon deficiencies may result in Owner referring the matter <br /> for corrective action in accordance with Section 00 72 00 <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) <br /> 01 78 36 -2 WARRANTIES AND BONDS <br />
The URL can be used to link to this page
Your browser does not support the video tag.