My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 26 00 10 - 24 <br /> Inductive Charging Infrastructure for Everett Transit <br /> 31. How to adjust, operate, and maintain equipment specified in Section 263213.16 <br /> "Gas-Engine-Driven Generator Sets." <br /> 32. How to adjust, operate, and maintain equipment specified in Section 263213.19 <br /> "Bi-Fuel-Engine-Driven Generator Sets." <br /> 33. How to adjust, operate, and maintain equipment specified in Section 263323.11 <br /> "Central Battery Equipment for Emergency Lighting." <br /> 34. How to adjust, operate, and maintain equipment specified in Section 263343 <br /> "Battery Chargers." <br /> 35. How to adjust, operate, and maintain equipment specified in Section 263353 <br /> "Static Uninterruptible Power Supply." <br /> 36. How to adjust, operate, and maintain equipment specified in Section 263533 <br /> "Power Factor Correction Equipment." <br /> 37. How to adjust, operate, and maintain transfer switches and related equipment, <br /> including ground-fault protection system, specified in Section 263600 "Transfer <br /> Switches." <br /> 38. How to adjust, operate, and maintain devices specified in Section 264313 "Surge <br /> Protective Devices for Low-Voltage Electrical Power Circuits." <br /> 39. How to adjust, operate, and maintain stage lighting equipment specified in <br /> Section 265561 "Theatrical Lighting." <br /> 40. How to adjust, operate, and maintain luminaires and photoelectric controls <br /> specified in Section 265619 "LED Exterior Lighting." <br /> END OF SECTION 260010 <br /> 26 00 10 - 24 SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.