My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Inductive Charging Infrastructure for Eclipse Mill Park 00 52 13 - 1 <br /> SECTION 00 5213 - AGREEMENT FORM <br /> CONTRACT <br /> THIS CONTRACT is made and entered into this day of , , by <br /> and between the City of Everett, Washington, a municipal corporation existing under the <br /> laws of the State of Washington (the "City") and <br /> VA I de m C0.f, s (c,ACk cD n Inc . , (the "Contractor"). <br /> In consideration of the sums to be paid to it by the City, Contractor hereby covenants and <br /> agrees to furnish all labor, tools, materials, equipment, and supplies required to complete <br /> in a workmanlike manner the work, improvements, and appurtenances in accordance with <br /> the Specifications and Drawings and all other Contract Documents entitled: "Inductive <br /> Charging Infrastructure for Eclipse Mill Park", (the "Project"). <br /> 1. Contract Documents. The "Contract Documents" are defined in the General <br /> Conditions. The Contract Documents are part of this Contract and are hereby <br /> incorporated by reference. Terms that are capitalized in a Contract Document but not <br /> defined in that Contract Document shall have the meaning defined to them in the other <br /> Contract Documents. <br /> 2. Contract Time. Substantial Completion of the Work shall be achieved within <br /> Three Hundred Sixty-Five (365) calendar days after the effective date of the Notice to <br /> Proceed. Physical Completion shall be within Thirty (30) calendar days after the actual <br /> date of issuance of Substantial Completion. <br /> 3. Liquidated Damages. The parties agree the City will suffer damage and be put <br /> to additional expense in the event that the Contractor does not complete the Work in all <br /> respects and have it ready for use by the Substantial and Physical Completion dates <br /> stated above. Because it is difficult to accurately compute the amount of such costs <br /> and damages, the Contractor hereby covenants and agrees to pay to the City liquidated <br /> damages for each and every calendar day (or working day, if Contract Time is <br /> described in working days) in the amounts set forth in this Section. For failure to <br /> achieve Substantial Completion by the Substantial Completion date stated above, the <br /> Contractor shall pay liquidated damages to the City computed at the daily rate of fifteen <br /> percent (15%) of the Contract Sum divided by the number of days of Contract Time <br /> stated above. Once Substantial Completion is achieved, for failure to achieve Physical <br /> Completion by the Physical Completion Date stated above, the Contractor shall pay <br /> liquidated damages at the daily rate of ten percent (10%) of the liquidated damages rate <br /> applicable to delays to Substantial Completion. <br /> 4. Contract Sum. The Contract Sum of this Contract is: <br /> 00 52 13 - 1 AGREEMENT FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.