Laserfiche WebLink
City of Everett 26 24 16 - 7 <br /> Inductive Charging Infrastructure for Everett Transit <br /> 3.3 IDENTIFICATION <br /> A. Identify field-installed conductors, interconnecting wiring, and components; install <br /> warning signs complying with requirements in Section 260553 "Identification for <br /> Electrical Systems." <br /> B. Panelboard Nameplates: Label each panelboard with nameplate complying with <br /> requirements for identification specified in Section 260553 "Identification for Electrical <br /> Systems." <br /> C. Device Nameplates: Label each branch circuit device in power panelboards with <br /> nameplate complying with requirements for identification specified in Section 260553 <br /> "Identification for Electrical Systems." <br /> D. Install warning signs complying with requirements in Section 260553 "Identification for <br /> Electrical Systems" identifying source of remote circuit. <br /> E. Panelboard Label: Manufacturer's name and trademark, voltage, amperage, number of <br /> phases, and number of poles must be located on interior of panelboard door. <br /> F. Breaker Labels: Faceplate must list current rating, UL and IEC certification standards, <br /> and AIC rating. <br /> G. Circuit Directory: <br /> 1. Provide directory card inside panelboard door, mounted in transparent card <br /> holder. <br /> a. Circuit directory must identify specific purpose with detail sufficient to <br /> distinguish it from other circuits. <br /> 2. Provide computer-generated circuit directory mounted inside panelboard door <br /> with transparent plastic protective cover. <br /> a. Circuit directory must identify specific purpose with detail sufficient to <br /> distinguish it from other circuits. <br /> 3. Create directory to indicate installed circuit loads after balancing panelboard <br /> loads; incorporate Owner's final room designations. Obtain approval before <br /> installing. Handwritten directories are not acceptable. Install directory inside <br /> panelboard door. <br /> 3.4 FIELD QUALITY CONTROL <br /> A. Acceptance Testing Preparation: <br /> 1. Test insulation resistance for each panelboard bus, component, connecting <br /> supply, feeder, and control circuit. <br /> 2. Test continuity of each circuit. <br /> B. Field tests and inspections must be witnessed by Owner's representative. <br /> C. Tests and Inspections: <br /> 26 24 16 - 7 PANELBOARDS <br />