My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 26 28 16 - 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS <br /> PART 1 - GENERAL <br /> 1.1 SUMMARY <br /> A. Section Includes: <br /> 1. Molded-case circuit breakers (MCCBs). <br /> 2. Enclosures. <br /> B. Related Requirements: <br /> 1. Section 260010 "Supplemental Requirements for Electrical" for additional <br /> abbreviations, definitions, submittals, qualifications, testing agencies, and other <br /> Project requirements applicable to Work specified in this Section. <br /> 1.2 DEFINITIONS <br /> A. GFEP: Ground-fault circuit-interrupter for equipment protection. <br /> B. GFLS: Ground-fault circuit-interrupter for life safety. <br /> C. SPDT: Single pole, double throw. <br /> 1.3 ACTION SUBMITTALS <br /> A. Product Data: <br /> 1. For each type of enclosed switch, circuit breaker, accessory, and component <br /> indicated. Include nameplate ratings, dimensioned elevations, sections, weights, <br /> and manufacturers' technical data on features, performance, electrical <br /> characteristics, ratings, accessories, and finishes. <br /> 2. Enclosure types and details for types other than UL 50E, Type 1. <br /> 3. Current and voltage ratings. <br /> 4. Short-circuit current ratings (interrupting and withstand, as appropriate). <br /> 5. Include evidence of qualified electrical testing laboratory listing for series rating of <br /> installed devices. <br /> 6. Detail features, characteristics, ratings, and factory settings of individual <br /> overcurrent protective devices, accessories, and auxiliary components. <br /> 7. Include time-current coordination curves (average melt) for each type and rating of <br /> overcurrent protective device; include selectable ranges for each type of <br /> overcurrent protective device. Provide in PDF electronic format. <br /> B. Shop Drawings: For enclosed switches and circuit breakers. <br /> 1. Include plans, elevations, sections, details, and attachments to other work. <br /> 2. Include wiring diagrams for power, signal, and control wiring. <br /> C. Field Quality-Control Submittals: <br /> 26 28 16 - 1 ENCLOSED SWITCHES AND CIRCUIT BREAKERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.