My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 26 28 16 - 5 <br /> Inductive Charging Infrastructure for Everett Transit <br /> PART 3 - EXECUTION <br /> 3.1 EXAMINATION <br /> A. Examine elements and surfaces to receive enclosed switches and circuit breakers for <br /> compliance with installation tolerances and other conditions affecting performance of <br /> the Work. <br /> B. Proceed with installation only after unsatisfactory conditions have been corrected. <br /> 1. Commencement of work will indicate Installer's acceptance of areas and <br /> conditions as satisfactory. <br /> 3.2 SELECTION OF ENCLOSURES <br /> A. Outdoor Locations: UL 50E, Type 3R. <br /> 3.3 INSTALLATION <br /> A. Comply with manufacturer's published instructions. <br /> B. Special Techniques: <br /> 1. Coordinate layout and installation of switches, circuit breakers, and components <br /> with equipment served and adjacent surfaces. Maintain required workspace <br /> clearances and required clearances for equipment access doors and panels. <br /> 2. Install individual wall-mounted switches and circuit breakers with tops at uniform <br /> height unless otherwise indicated. <br /> 3. Comply with mounting and anchoring requirements specified in Section 260548.16 <br /> "Seismic Controls for Electrical Systems." <br /> 4. Temporary Lifting Provisions: Remove temporary lifting of eyes, channels, and <br /> brackets and temporary blocking of moving parts from enclosures and <br /> components. <br /> 5. Install fuses in fusible devices. <br /> 3.4 IDENTIFICATION <br /> A. Comply with requirements in Section 260553 "Identification for Electrical Systems." <br /> 1. Identify field-installed conductors, interconnecting wiring, and components; provide <br /> warning signs. <br /> 2. Label each enclosure with engraved metal or laminated-plastic nameplate. <br /> 3.5 FIELD QUALITY CONTROL <br /> A. Acceptance Testing: <br /> B. Field tests and inspections must be witnessed by Owner Representative. <br /> 26 28 16 - 5 ENCLOSED SWITCHES AND CIRCUIT BREAKERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.