My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 31 11 00 - 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 31 11 00 - CLEARING AND GRUBBING <br /> PART 1 -GENERAL <br /> 1.1 DESCRIPTION <br /> A. The work includes clearing and grubbing areas within the boundary limits shown on the <br /> plans or staked by the Engineer. This work also includes protecting from harm all trees, <br /> bushes, shrubs or other objects selected to remain. <br /> 1. "Clearing" means removing and disposing of all unwanted material from the surface <br /> such as trees, brush, down timber or other natural materials. <br /> 2. "Grubbing" means removing and disposing of all unwanted vegetative matter from <br /> underground such as sod, stumps, roots, buried logs or other debris. <br /> 3. "Debris" means all nonusable natural material produced by clearing and grubbing. <br /> 1.2 STANDARD SPECIFICATIONS <br /> A. All work to be performed and materials to be used shall be in accordance with the latest <br /> version of the Standard Specifications and Standard Plans for Road, Bridge and <br /> Municipal Construction, as published by the Washington State Department of <br /> Transportation (WSDOT), unless otherwise indicated herein. <br /> B. The Contractor shall have one copy of the Standard Specifications and Standard Plans <br /> at the job site. <br /> C. The Standard Specifications apply only to performance and materials and how they <br /> are to be incorporated into the work. The legal/contractual relationship sections and the <br /> measurement and payment sections do not apply to this document. <br /> 1.3 FIELD CONDITIONS <br /> A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent <br /> occupied or used facilities during site-clearing operations. <br /> 1.Do not close or obstruct streets, walks, or other adjacent occupied or used facilities <br /> without permission from Owner and authorities having jurisdiction. <br /> 2.Provide alternate routes around closed or obstructed traffic routes if required by Owner <br /> or authorities having jurisdiction. <br /> B. Salvageable Improvements: Carefully remove items indicated to be salvaged and store <br /> on Owner's premises. <br /> C. Utility Locator Service: Notify utility locator service for area where Project is located <br /> before site clearing. <br /> D. Do not commence site clearing operations until temporary erosion- and sedimentation- <br /> control measures are in place. <br /> PART 2 - PRODUCTS <br /> 31 11 00 - 1 CLEARING AND GRUBBING <br />
The URL can be used to link to this page
Your browser does not support the video tag.