My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CNA <br /> Contractors' General Liability Extension Endorsement <br /> representative, or spouse outside the scope of such person's capacity or status as such, provided however that the <br /> spouse of a natural person Named Insured and the spouses of members or partners of joint venture or partnership <br /> Named Insureds are Insureds with respect to such spouses' acts, errors or omissions in the conduct of the <br /> Named Insured's business. <br /> 10. EXPECTED OR INTENDED INJURY—EXCEPTION FOR REASONABLE FORCE <br /> Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled <br /> Exclusions is amended to delete the exclusion entitled Expected or Intended Injury and replace it with the <br /> following: <br /> This insurance does not apply to: <br /> Expected or Intended Injury <br /> Bodily injury or property damage expected or intended from the standpoint of the Insured. This exclusion does <br /> not apply to bodily injury or property damage resulting from the use of reasonable force to protect persons or <br /> property. <br /> 11. GENERAL AGGREGATE LIMITS OF INSURANCE-PER PROJECT <br /> A. For each construction project away from premises the Named Insured owns or rents, a separate Construction <br /> Project General Aggregate Limit, equal to the amount of the General Aggregate Limit shown in the Declarations, <br /> is the most the Insurer will pay for the sum of: <br /> 1. All damages under Coverage A, except damages because of bodily injury or property damage <br /> included in the products-completed operations hazard; and <br /> 2. All medical expenses under Coverage C, <br /> that arise from occurrences or accidents which can be attributed solely to ongoing operations at that <br /> construction project. Such payments shall not reduce the General Aggregate Limit shown in the Declarations, <br /> nor the Construction Project General Aggregate Limit of any other construction project. <br /> B. All: <br /> 1. Damages under Coverage B, regardless of the number of locations or construction projects involved; <br /> 2. Damages under Coverage A, caused by occurrences which cannot be attributed solely to ongoing <br /> operations at a single construction project, except damages because of bodily injury or property damage <br /> included in the products-completed operations hazard; and <br /> 3. Medical expenses under Coverage C caused by accidents which cannot be attributed solely to ongoing <br /> operations at a single construction project, <br /> will reduce the General Aggregate Limit shown in the Declarations. <br /> C. The limits shown in the Declarations for Each Occurrence, for Damage To Premises Rented To You and for <br /> Medical Expense continue to apply, but will be subject to either the Construction Project General Aggregate Limit <br /> or the General Aggregate Limit shown in the Declarations, depending on whether the occurrence can be <br /> attributed solely to ongoing operations at a particular construction project. <br /> D. When coverage for liability arising out of the products-completed operations hazard is provided, any <br /> payments for damages because of bodily injury or property damage included in the products-completed <br /> operations hazard will reduce the Products-Completed Operations Aggregate Limit shown in the Declarations, <br /> regardless of the number of projects involved. <br /> E. If a single construction project away from premises owned by or rented to the Insured has been abandoned and <br /> then restarted, or if the authorized contracting parties deviate from plans, blueprints, designs, specifications or <br /> timetables,the project will still be deemed to be the same construction project. <br /> CNA74705XX(1-15) Policy No: <br /> Page 8 of 17 Endorsement No: <br /> Effective Date: <br /> Insured Name: <br /> Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office,Inc.,with its permission. <br />
The URL can be used to link to this page
Your browser does not support the video tag.