My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT 00 01 10 -2 <br /> Inductive Charging Infrastructure for Everett Transit <br /> 01 50 00 Temporary Facilities and Controls <br /> 01 55 00 Vehicular Access and Parking <br /> 01 57 00 Temporary Controls <br /> 01 72 29 Cutting and Patching <br /> 01 74 19 Construction Waste and Disposal <br /> 01 74 23 Final Cleaning <br /> 01 77 00 Closeout Procedures <br /> 01 78 23 Operation and Maintenance Data <br /> 01 78 36 Warranties and Bonds <br /> 01 78 39 Project Record Documents <br /> Facility Construction Subgroup <br /> DIVISION 2: EXISTING CONDITIONS <br /> 02 41 00 Demolition <br /> DIVISION 26: ELECTRICAL SYSTEMS <br /> 26 00 10 Supplemental Requirements for <br /> Electrical <br /> 26 05 19 Low-Voltage Electrical Power <br /> Conductors and Cables <br /> 26 05 26 Grounding and Bonding for Electrical <br /> Systems <br /> 26 05 29 Hangers and Supports for Electrical <br /> Systems <br /> 26 05 33.13 Conduits for Electrical Systems <br /> 26 05 33.16 Boxes and Covers for Electrical <br /> Systems <br /> 26 05 43 Underground Ducts and Raceway for <br /> Electrical Systems <br /> 26 05 53 Identification for Electrical Systems <br /> 26 05 73.13 Short-Circuit Studies <br /> 26 05 73.16 Coordination Studies <br /> 26 05 73.19 Arc-Flash Hazard Analysis <br /> 26 22 13 Low-Voltage Distribution <br /> Transformers <br /> 26 24 16 Panelboards <br /> 26 28 16 Enclosed Switches and Circuit <br /> Breakers <br /> DIVISION 31: EARTHWORK <br /> 31 00 00 Earthwork <br /> 31 11 00 Clearing and Grubbing <br /> DIVISION 32: EXTERIOR IMPROVEMENTS <br /> 32 11 23 Aggregate Base Courses <br /> 00 01 10 - 2 TABLE OF CONTENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.