Laserfiche WebLink
I <br /> City of Everett 00 7200 - <br /> Inductive Charging Infrastructure for Everett Transit <br /> 9.6.6. For Contractor Markup on Subcontractor's Work 39 <br /> 9.7. Retainage 40 <br /> 10. NOTICE TO OWNER 41 <br /> 10.1 When Notice Must Be Given 41 <br /> 10.2 Form of Notice 42 <br /> 10.3 Supplemental Information 42 <br /> 11. DIFFERING SITE CONDITIONS 42 <br /> 12. CONTRACT CLAIMS 43 <br /> 12.1 General 43 <br /> 12.2 Contents 44 <br /> 12.3 FALSE OR OMITTED INFORMATION 45 <br /> 12.4 Remedies 45 <br /> 12.4.1 General 45 <br /> 12.4.2 Extra Work 45 1 <br /> 12.4.2.1 Adjustment of Contract Sum 45 <br /> 12.4.2.2 Extension of Contract Time 46 <br /> 12.4.3 Delays 46 <br /> 12.4.3. Owner Caused Delay Unrelated to Extra Work 46 <br /> 12.4.3.1.1 Adjustment of Contract Sum 46 <br /> 12.4.3.1.2 Adjustment of Contract Time 46 <br /> 12.4.3.2 Contractor Caused Delay 46 <br /> 12.4.3.3 Delays Concurrently Caused by Contractor and Owner 46 <br /> 12.4.3.3.1 Adjustment of Contract Sum 46 <br /> 12.4.3.3.2 Adjustment of Contract Time 46 <br /> 12.4.3.4 Adjustment of Contract Sum 46 <br /> 12.4.3.4.1 Caused Solely by Third Parties or Force Majeure 46 <br /> 12.4.3.4.2 Adjustment of Contract Time 47 <br /> 12.4.3.5 Extended or Unabsorbed Overhead 47 <br /> 12.4.3.5.1 General 47 <br /> 12.4.3.5.2 Elements 47 <br /> 12.4.3.5.2.1 Resources 48 <br /> 12.4.3.5.2.2 No Material Variations 48 <br /> 12.4.3.5.2.3 Overabsorbed Overhead 48 <br /> 12.4.4 Inefficiencies 48 <br /> 12.4.4.1 Adjustment of Contract Sum 48 <br /> 12.4.4.2 Adjustment of Contract Time 48 <br /> 13. DISPUTES 49 <br /> 13.1 Resolution 49 <br /> 13.2 Continuing the Work 49 <br /> 14. TIME LIMITATIONS AND JURISDICTION 49 <br /> 15. LIABILITY AND INSURANCE 49 1 <br /> 15.1 General 49 <br /> 15.2 Bonds 49 <br /> 00 7200 - GENERAL CONDITIONS <br /> I <br />