Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 7200 - 1 <br /> I <br /> 1. GENERAL INFORMATION <br /> 1.1 DEFINITIONS OF WORDS AND TERMS <br /> Where used in the Contract Documents,the following words and terms shall have the meanings indicated. <br /> The meanings shall be applicable to the singular,plural,masculine and feminine of all words and terms. <br /> Addenda:Written or graphic instruments issued prior to the opening of Bids that clarify,correct,or <br /> change the Bidding Requirements or the proposed Contract Documents. <br /> Additive:A supplemental unit of work or group of bid items,identified separately in the Bid Form,that <br /> may,at the discretion of the City,be awarded in addition to the base Bid. <br /> Alternative or Alternate:One of two or more units of Work or groups of bid items,identified separately <br /> in the Bid Form,from which the City may make a choice between different methods or material of <br /> construction for performing the same Work. <br /> Application for Payment:Form acceptable to Owner that Contractor is to use during the course of the <br /> Work in requesting progress or final payments that is to be accompanied by such supporting <br /> documentation as is required by the Contract Documents. <br /> Architect:An individual or entity retained by the Owner to be the Owner's representative with regard to <br /> matters of design intent. The terms"Owner's Representative","Engineer"and"Architect"are <br /> interchangeable. <br /> Award Date: The date of the formal action by the Everett City Council to accept the lowest responsible <br /> and responsive Bidder for the Work. <br /> Bid: The offer or proposal of a bidder submitted on the prescribed form setting forth the prices for the <br /> Work to be performed. <br /> Bid Form—The form provided to Bidders by the City for submittal of a Proposal or Bid to the City for a <br /> specific project. <br /> Bidder: An individual,partnership,firm,corporation,or joint venture, submitting a Bid. <br /> Bid Opening Date: The date the Everett City Clerk publicly opens and reads the Bids. <br /> 1 Call for Bids(Advertisement for Bids): The published public notice soliciting or Bids for Work stating, <br /> among other things,the time,place,and date for receiving and opening the Bids. <br /> ' Change Order: Reference to Change Order shall include all rights of the Owner and Contractor under <br /> ARTICLE 6. CHANGES. <br /> Completion Date: Date on which Project is ready for Final Acceptance.All physical Work,including <br /> Punch List,is complete and Contractor has completed and fulfilled all contractual obligations except any <br /> maintenance of landscaping.Contractual obligations that must be fulfilled prior to achievement of the <br /> Completion Date include,but are not limited to,the Contractor's furnishing all documentation(including <br /> correct,complete and accurate as-built or record drawings)and operation and maintenance manuals and <br /> transfer of warranties. <br /> Contract:Agreement signed by the Owner and Contractor(Section 005213).Depending on context, <br /> "Contract"may also refer to the Contract Documents as a whole.Contract Documents are defined in <br /> section 1.2 below. <br /> Contract Claim:Any request by the Contractor for additional time or money(adjustment of Contract <br /> Sum or Contract Time)irrespective of the cause or reason for the request. Contract Claims include,but <br /> are not limited to,requests by the Contractor for additional time or money due to Extra Work, <br /> inefficiencies,Delays,interferences,and problems with the design. Contract Claim includes,but is not <br /> limited to,claims or requests by Subcontractors for extensions of Contract Time,adjustment of Contract <br /> I <br /> 00 7200 - 1 GENERAL CONDITIONS <br />