My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> City of Everett 00 7200 - 9 <br /> 3. OWNER <br /> ' 3.1. GENERAL <br /> The Owner,and the Owner's Representative,shall have the authority to act as the sole judge of the Work, <br /> ' Equipment and materials with respect to both quantity and quality as set forth in the Contract.It is <br /> expressly stipulated that the Drawings, Specifications and other Contract Documents set forth the <br /> requirements as to the nature of the completed Work and do not purport to control the method of <br /> ' performing Work except in those instances where the nature of the completed Work is dependent on the <br /> method of performance. <br /> The Owner has the authority to act,do,perform,and make any all decisions and actions authorized by the <br /> Contract Documents,including,but not limited to,Change Orders,progress payments,Contract <br /> decisions,acceptability of the Contractor's Work,and early possession.The Owner has the authority to <br /> accept or reject requests for progress payments that have been submitted by the Contractor and <br /> recommended by the Owner's Representative. The Owner has the authority to make determinations of <br /> the acceptability of the Work. The Owner also has the authority to accept or reject the Owner's <br /> Representative's recommendations regarding retention of defective Work. <br /> ' 3.2. OWNER'S REPRESENTATIVE <br /> The Owner's Representative shall be satisfied that all the Work is being done in accordance with the <br /> requirements of the Contract.The Contract and Specifications give the Owner's Representative authority <br /> ' over the administration of the Contract. Whenever it is so provided in this Contract,the decision of the <br /> Owner's Representative shall be final. <br /> The Owner's Representative's decisions will be final on all questions including but not limited to,unless <br /> ' specifically assigned to an Architect or Engineer,the following: <br /> 1. Measurement of Work,whether lump sum,Force Account,or unit price; <br /> 2. Acceptability of rates of progress on the Work; <br /> 3. Interpretation of Drawings and Specifications with regard to administrative matters; <br /> 4. Determination as to the existence of changed or differing site conditions; <br /> 5. Fulfillment of the Contract by the Contractor; <br /> 6. Payments under the Contract including adjustment and; <br /> ' 7. Suspension(s)of Work. <br /> If the Contractor fails to respond promptly to the requirements of the Contract or orders from the Owner's <br /> Representative: <br /> ' 1. The Owner's Representative may use the Owner's resources,other contractors,or other means to <br /> accomplish the Work,and <br /> 2. The Owner will not be obligated to pay the Contractor,and will deduct from the Contractor's <br /> payments,any costs that result when any other means are used to carry out the Contract <br /> requirements or Owner's Representative's orders. <br /> At the Contractor's risk,the Owner's Representative may suspend all or part of the Work if: <br /> ' 1. The Contractor fails to fulfill Contract terms,to carry out the Owner's Representative's orders,or <br /> to correct unsafe conditions of any nature; or <br /> ' 2. It is in the public interest. <br /> The Owner's Representative and Owner shall have complete access to the Work and to the Site of the <br /> Work and to the places where Work is being prepared or where materials,Equipment,and machinery are <br /> being obtained for the Work. If requested by the Owner's Representative or Owner,the Contractor shall <br /> 00 7200 - 9 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.