My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 14 <br /> the permission of the Owner's Representative and the proper governmental authority.Fire hydrants on or <br /> adjacent to the Work shall be accessible to fire fighting Equipment. Temporary provisions shall be made <br /> by the Contractor for the use of sidewalks,private and public driveways and proper functioning of gutters, <br /> sewer inlets,drainage ditches and culverts,irrigation ditches and natural water courses. <br /> 4.4.10.Access to Work <br /> Owner,Owner's Representative,their consultants and other representatives and personnel of Owner, <br /> independent testing laboratories,and governmental agencies with jurisdictional interests will have access <br /> to the Site and the Work at reasonable times for their observation,inspecting,and testing. Contractor shall <br /> provide them proper and safe conditions for such access and advise them of Contractor's Site safety <br /> procedures and programs so that they may comply therewith as applicable. <br /> 4.4.11. Emergencies ' <br /> In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent <br /> thereto,Contractor is obligated to act to prevent threatened damage,injury,or loss. Contractor shall give <br /> Owner's Representative prompt written notice if Contractor believes that any significant changes in the <br /> Work or variations from the Contract Documents have been caused thereby or are required as a result <br /> thereof. If Owner's Representative determines that a change in the Contract Documents is required be- <br /> cause of the action taken by Contractor in response to such an emergency,a Work Change Directive or <br /> Change Order will be issued. <br /> 4.4.12. Trench Excavation <br /> For all trench excavations that exceed a depth of four feet,the Contractor must use adequate safety ' <br /> systems that meet the requirements of the Washington Industrial Safety and Health Act,chapter 49.17 <br /> RCW. <br /> 4.4.13 'COVID-19 Requirements ' <br /> The Contractor shall be in compliance at all times with all governmental laws,regulations,requirements, <br /> and orders relating to COVID-19 applicable to the Work,including without limitation OSHA,L&I or <br /> other safety rules relating to COVID-19 and COVID-19 gubernatorial proclamations and orders.These <br /> laws,regulations,requirements,and orders are referred to as"COVID-19 Requirements." <br /> Contractor's Bid includes all costs necessary for the duration of the Work for compliance with COVID-19 , <br /> Requirements.Contractor's Bid takes into account that COVID-19 Requirements may create direct and <br /> indirect costs,including inefficiency and delay. <br /> Contractor shall have no entitlement to an adjustment or other increase to the Contract Sum for any direct or <br /> indirect costs(including without limitation delay,cumulative impact,inefficiency or ripple costs)incurred <br /> by the Contractor to comply with COVID-19 Requirements. <br /> 4.5. OWNER-CONTRACTOR COORDINATION <br /> 4.5.1. Service of Notice <br /> Contractor agrees that any Notice,order,direction,request or other communication by the Owner's <br /> Representative or Owner to the Contractor shall be deemed received by the Contractor if left at any office <br /> used by the Contractor or delivered to any of the Contractor's officers,clerks or employees or posted at <br /> the site of the Work or mailed to any post office addressed to the Contractor at the address given in the <br /> Contract Documents or mailed to the Contractor's last known place of business.If mailed,any form of <br /> communication will be deemed to have been given to and received by the Contractor the day after the day <br /> of mailing. ' <br /> 00 7200 - 14 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.