Laserfiche WebLink
CONSTRUCTION COST SUMMARY <br /> Project Name: <br /> Project No.: <br /> GC/CM Contract or Amendment No.: <br /> Date: <br /> Initial Value of Value of Contract <br /> Contract All Previous Current Value <br /> Bid Pkg.#Description of Bid Package(or csi modified Uni-format) Value Amendments Amendment To Date <br /> $ - <br /> $ - <br /> $ - <br /> $ <br /> $ <br /> $ - <br /> $ - <br /> $ - <br /> $ - <br /> $ <br /> $ - <br /> $ - <br /> $ - <br /> $ - <br /> $ <br /> $ - <br /> Line# Subtotal for Direct Subcontract Work $ - $ - $ - $ - <br /> 1 <br /> 2 Estimating/Design Contingency n/a n/a n/a n/a <br /> 3 Escalation n/a n/a n/a n/a <br /> 4 Subcontractor Bonds(included in bid packages) Included Included Included Included <br /> Subtotal for Other Contract Costs 5 $ $ $ $ <br /> (Add Lines 2,3 and 4) <br /> 6 Total Subcontract Costs $ $ - $ - $ <br /> (Add Lines land 5) <br /> 7 GC/CM Risk Contingency(Line 6 x%Shown Below) $ - $ - $ - $ - <br /> GC/CM Maximum Allowable ConstructionCost(MACC) <br /> 8 $ - $ - $ - $ <br /> (Add Lines 6 and 7) <br /> 9 GC/CM Fee(Line 6 x%Shown Below) $ - $ - $ - $ - <br /> 10 Negotiated Support Services $ - <br /> 11 Fixed Amount for Specified General Conditions $ - <br /> 12 Total Contract Cost(TCC) $ $ $ $ <br /> (Add Lines 8,9,10 and 11) <br /> 13 Preconstruction Services $ - <br /> 14 TCC+PreconstructionServices $ $ $ - $ <br /> (Add Lines 12 and 13) <br /> Ref. Risk Contingency&Fee Percentages Applicable to This Contract NOTE: <br /> Line 7 GC/CM Risk Contingency Percentage Sales tax applies to the contract value at <br /> Line 9 GC/CM Fee Percentage rate applicable when work is performed. <br /> City of Everett Municipal Building February 3, 2023 <br /> Everett Municipal Building Public Works Tenant Spec Sect.00 50 04-Att.No.3 <br /> Improvements Attach. No 3-3 Form of Construction Cost Summary <br /> RFFP for GC/CM Services <br />