Laserfiche WebLink
GC/CM Preconstruction Work Plan <br /> Project: <br /> Date: <br /> Duration(Date to Date): Number of Weeks: <br /> Project Project PreCon Project Assistant QA/QC Safety <br /> Job Title Executive Manager Manager Project Super Estimator Scheduler Engineer Super Manager Manager Mechanical Electrical Plumbing <br /> Staff Name <br /> SOW# Major Activities <br /> 1-2 Work During 30%(Schematic)Design <br /> 1-2.01 Attend Bi-weekly Project Management Meetings <br /> 1-2.02 Attend Intermediate&Final 30%Design Team/Owner Meeting 1-2.03 Provide Constructability Comments and Estimating Services <br /> 1-2.04 Provide Comments on Construction Feasibility and Safety 1-2.05 Propose Alt.Designs/Materials&Recommend Site Logistics <br /> 1-2.06 Review Record Drawings and Investigate Existing Conditions <br /> 1-2.07 Recommend Investigations to Verify Exist Conds.&Systems <br /> 1-2.08 Review Schedule <br /> 1-2.09 Review 30%Drawings/Specs <br /> 1-2.10 Prepare Cost Estimate <br /> 1-2.11 Create VE Tracking System 1-3 Work During 60%(Design Development)Design <br /> Attend Project Mgmnt,Intermediate and Final 60%Design <br /> 1-3.01 Team/Owner Meetings <br /> 1-3.02 Provide Constructability and Estimating Services <br /> 1-3.03 Provide VE and Constructability <br /> 1-3.04 Develop Phasing Plan <br /> 1-3.05 Master Summary Schedule <br /> 1-3.06 Identify Early Bid Packages and Procurement <br /> 1-3.07 Review 60%Design Docs <br /> 1-3.08 Verify 60%Design Docs with Exist Site Conditions <br /> 1-3.09 Prepare Cost Estimate <br /> 1-3.10 Update VE Tracking <br /> 1-3.11 Support Constructability&VE review/incorporation <br /> 1-4 Work During 90%(Permit Documents)Design <br /> Attend Project Mgmnt,Intermediate and Final 90%Design <br /> 1-4.01 Team/Owner Meetings <br /> 1-4.02 Provide Constructability and Estimating Services <br /> 1-4.03 Develop Phasing Plans _1-4.04 Support Constructability&VE review/incorporation <br /> 1-4.05 Update Project Schedule <br /> 1-4.06 Prepare Procurement Docs for Long Lead and mini-MACC's <br /> 1-4.07 Manage Contracts for Building Engineering Systems <br /> 1-4.08 OA Check of Construction Documents <br /> 1-4.09 Constructability Analysis of Sub Bid Packages <br /> 1-4.10 Verify Design Docs with Exist.Site Conditions <br /> 1-4.11 Prepare Cost Estimate <br /> 1-4.12 Monitor Development of 90%Docs <br /> Hours 0 0 0 10 0 0 0 0 0 0 0 0 0 <br /> Rate <br /> Subtotal $ - 1$ - $ - I$ - Is - Is - Is - Is - Is - Is - Is - I$ - I$Total $ <br />