Laserfiche WebLink
TABLE OF CONTENTS <br /> Division 00 — Proposal Requirements, Contract Forms, and General Conditions <br /> 00 22 13 Request for Final Proposals (RFFP) for GC/CM Services <br /> 00 40 00 Final Proposal Form <br /> 00 50 00 Standard Form of Agreement Between Owner and Construction Manager as <br /> Constructor <br /> 00 50 01 Exhibit A—Guaranteed Maximum Price Amendment <br /> 00 50 02 Attachment No. 1 —Summary Cost Responsibility Matrix <br /> 00 50 03 Attachment No. 2— Form of Construction Cost Estimate (sample) <br /> 00 50 04 Attachment No. 3—Construction Cost Summary (sample) <br /> 00 50 05 Attachment No. 4—List of Contract Documents (sample) <br /> 00 50 06 Attachment No. 5—List of Negotiated Support Services (sample) <br /> 00 50 07 Attachment A-1 —Scope of Work for Preconstruction Services <br /> 00 50 08 Attachment A-2—GC/CM Preconstruction Work Plan <br /> 00 50 09 Attachment B — Insurance Requirements <br /> 00 50 10 Attachment C — Prevailing Wage Rates Information <br /> 00 68 00 Apprentice Utilization and Reporting <br /> 00 72 00 General Conditions <br /> Division 01 —General Requirements <br /> 01 11 00 Summary of Work <br /> 01 23 00 Alternates GC/CM <br /> 01 25 00 Substitutions <br /> 01 26 00 Contract Modifications <br /> 01 29 76 Progress Payments GC/CM <br /> 01 31 00 Project Management Coordination <br /> 01 31 19 Project Meetings <br /> 01 32 16 Construction Progress Schedule <br /> 01 33 00 Submittal Procedures GC/CM <br /> 01 35 23 Safety GC/CM <br /> 01 42 00 References <br /> 01 45 00 Contractor Quality Control <br /> 01 45 23 Testing and Inspection GC/CM <br /> 01 50 00 Temporary Facilities and Controls GC/CM <br /> 01 56 39 Temporary Tree Protection Plan GC/CM <br /> 01 58 00 Project Identification <br /> 01 71 23 Field Engineering <br /> 01 73 39 Cutting and Patching GC/CM <br /> 01 74 00 Construction Waste Management <br /> 01 75 00 Test Engineer Services GC/CM <br /> 01 77 00 Closeout Procedures <br /> 01 78 36 Warranties <br /> 01 91 00 Commissioning <br /> Appendices <br /> Appendix A Division 00 and 01 Forms <br /> END OF SECTION <br /> City of Everett Municipal Building February 3, 2023 <br /> Everett Municipal Building Public Works Tenant Specification <br /> Improvements i Table of Contents <br /> RFFP for GC/CM Services <br />