Laserfiche WebLink
§2.0.28 The Owner-Architect Agreement is the separate agreement between the Owner and the Architect relating to <br /> the design of the Project. <br /> §2.0.29 The Owner's Designated Representative,identified above,is a representative of the Owner.His or her duties <br /> and responsibilities are specified in the Contract Documents.The Owner's Representative itself is not empowered to <br /> waive any terms or conditions of the Contract Documents or to commit the Owner to additional costs or time except as <br /> explicitly provided in this Agreement. <br /> §2.0.30 The Preconstruction Phase is defined in Section 3.1 and generally consists of the initial portion of the <br /> Construction Manager's services and performance under the Contract prior to execution of the GMP Amendment or <br /> issuance of the Notice to Proceed. <br /> §2.0.31 The Preconstruction Services generally consist of those services provided by the Construction Manager under <br /> Section 3.1 of this Agreement. <br /> §2.0.32 The Preconstruction Services Cost is defined in Section 5.1 of this Agreement and is the compensation <br /> payable by the Owner to the Construction Manager for Preconstruction Services. <br /> §2.0.33 The Project is defined on the cover page above and in Section 1.1.4 of the revised General Conditions. <br /> §2.0.34 The Owner's Project Manager, listed in Section 1.1.8 above, if any,is the entity with whom the Owner has <br /> contracted in a separate Owner-Project Manager agreement.The Owner's Project Manager reports to the Owner's <br /> Representative. To the extent determined by Owner,the Owner's Project Manager will provide project management <br /> services and will act as the primary point of contact for Owner-Construction Manager communications and for all <br /> matters relating to the services and requirements of this Agreement. <br /> §2.0.35 The Project Team consists of the Construction Manager,the Owner,the Architect,the Project Manager,and all <br /> consultants and Subcontractors of any tier employed or retained by each of them. <br /> §2.0.36 Specifications are defined in Section 1.1.6 of the revised General Conditions and generally consist of the <br /> portion of the Contract Documents consisting of the written requirements for materials,equipment,systems,standards <br /> and workmanship for the Work,and performance or related services. <br /> §2.0.37 Specified General Conditions are further defined in Section 6.1.8 and Article 7 of this Agreement and <br /> generally mean certain selected general conditions Work and services specified in the Contract Documents to be <br /> provided by the Construction Manager for the fixed Specified General Conditions price as a part of the Cost of the <br /> Work.The Specified General Conditions are to be performed by the Construction Manager with its own forces in most <br /> instances. The Specified General Conditions include and pay for any Preconstruction Services that occur after the GMP <br /> is established through execution of the GMP Amendment.The Specified General Conditions include but are not limited <br /> to all bonds and insurance required by Article 11 of the A201 (but not builder's risk insurance under Section 11.3 which <br /> is a Negotiated Support Service or shall be provided by the Owner),the Construction Manager's construction <br /> administration,management services and supervision of the Project,all costs associated with the subcontractor bidding <br /> process(except costs of document reproduction),such as developing solicitations,site tours,responding to questions <br /> from bidders,providing a bid opening facility(unless the Owner elects to provide such facilities),bidding in accordance <br /> with the requirements of the Contract Documents and Chapter 39.10 RCW,subcontract award,and all aspects of safety <br /> implementation and administration.Any cost that is not specifically identified as a reimbursable Cost of the Work shall <br /> be covered by the amount bid for Specified General Conditions. <br /> §2.0.38 The Subcontracting Plan is defined in Section 3.1.12 and is prepared by the Construction Manager for the <br /> Owner's approval prior to conclusion of the Design Development phase.It identifies all proposed subcontract bid <br /> packages,any contemplated alternative subcontractor selection process permitted by RCW 39.10,any bid packages for <br /> which the Construction Manager expects to compete,all subcontractor scopes of work,the timing of solicitation of <br /> subcontractor bids for the packages to meet the Construction Schedule,major coordination issues with other packages, <br /> and means to enhance the opportunity for local businesses to participate in performing the Work. <br /> §2.0.39 A Subcontractor is defined in Section 5.1 of the revised General Conditions and is generally a person or entity <br /> that has a direct contract with the Construction Manager. A Subcontractor of any tier is a Subcontractor or a lower <br /> AIA Document A133- - 2019. Copyright C. 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The <br /> "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are registered trademarks and may not be used 6 <br /> without permission. This draft was produced by AIA software at 13:10:24 ET on 04/22/2021 under Order No.7856855196 which expires on <br /> 05/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms <br /> of Service. To report copyright violations, e-mail copyright@aia.org. <br /> User Notes: (1279676012) <br />