My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Other Agreements
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§2.0.28 The Owner-Architect Agreement is the separate agreement between the Owner and the Architect relating to <br /> the design of the Project. <br /> §2.0.29 The Owner's Designated Representative,identified above,is a representative of the Owner.His or her duties <br /> and responsibilities are specified in the Contract Documents.The Owner's Representative itself is not empowered to <br /> waive any terms or conditions of the Contract Documents or to commit the Owner to additional costs or time except as <br /> explicitly provided in this Agreement. <br /> §2.0.30 The Preconstruction Phase is defined in Section 3.1 and generally consists of the initial portion of the <br /> Construction Manager's services and performance under the Contract prior to execution of the GMP Amendment or <br /> issuance of the Notice to Proceed. <br /> §2.0.31 The Preconstruction Services generally consist of those services provided by the Construction Manager under <br /> Section 3.1 of this Agreement. <br /> §2.0.32 The Preconstruction Services Cost is defined in Section 5.1 of this Agreement and is the compensation <br /> payable by the Owner to the Construction Manager for Preconstruction Services. <br /> §2.0.33 The Project is defined on the cover page above and in Section 1.1.4 of the revised General Conditions. <br /> §2.0.34 The Owner's Project Manager, listed in Section 1.1.8 above, if any,is the entity with whom the Owner has <br /> contracted in a separate Owner-Project Manager agreement.The Owner's Project Manager reports to the Owner's <br /> Representative. To the extent determined by Owner,the Owner's Project Manager will provide project management <br /> services and will act as the primary point of contact for Owner-Construction Manager communications and for all <br /> matters relating to the services and requirements of this Agreement. <br /> §2.0.35 The Project Team consists of the Construction Manager,the Owner,the Architect,the Project Manager,and all <br /> consultants and Subcontractors of any tier employed or retained by each of them. <br /> §2.0.36 Specifications are defined in Section 1.1.6 of the revised General Conditions and generally consist of the <br /> portion of the Contract Documents consisting of the written requirements for materials,equipment,systems,standards <br /> and workmanship for the Work,and performance or related services. <br /> §2.0.37 Specified General Conditions are further defined in Section 6.1.8 and Article 7 of this Agreement and <br /> generally mean certain selected general conditions Work and services specified in the Contract Documents to be <br /> provided by the Construction Manager for the fixed Specified General Conditions price as a part of the Cost of the <br /> Work.The Specified General Conditions are to be performed by the Construction Manager with its own forces in most <br /> instances. The Specified General Conditions include and pay for any Preconstruction Services that occur after the GMP <br /> is established through execution of the GMP Amendment.The Specified General Conditions include but are not limited <br /> to all bonds and insurance required by Article 11 of the A201 (but not builder's risk insurance under Section 11.3 which <br /> is a Negotiated Support Service or shall be provided by the Owner),the Construction Manager's construction <br /> administration,management services and supervision of the Project,all costs associated with the subcontractor bidding <br /> process(except costs of document reproduction),such as developing solicitations,site tours,responding to questions <br /> from bidders,providing a bid opening facility(unless the Owner elects to provide such facilities),bidding in accordance <br /> with the requirements of the Contract Documents and Chapter 39.10 RCW,subcontract award,and all aspects of safety <br /> implementation and administration.Any cost that is not specifically identified as a reimbursable Cost of the Work shall <br /> be covered by the amount bid for Specified General Conditions. <br /> §2.0.38 The Subcontracting Plan is defined in Section 3.1.12 and is prepared by the Construction Manager for the <br /> Owner's approval prior to conclusion of the Design Development phase.It identifies all proposed subcontract bid <br /> packages,any contemplated alternative subcontractor selection process permitted by RCW 39.10,any bid packages for <br /> which the Construction Manager expects to compete,all subcontractor scopes of work,the timing of solicitation of <br /> subcontractor bids for the packages to meet the Construction Schedule,major coordination issues with other packages, <br /> and means to enhance the opportunity for local businesses to participate in performing the Work. <br /> §2.0.39 A Subcontractor is defined in Section 5.1 of the revised General Conditions and is generally a person or entity <br /> that has a direct contract with the Construction Manager. A Subcontractor of any tier is a Subcontractor or a lower <br /> AIA Document A133- - 2019. Copyright C. 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The <br /> "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are registered trademarks and may not be used 6 <br /> without permission. This draft was produced by AIA software at 13:10:24 ET on 04/22/2021 under Order No.7856855196 which expires on <br /> 05/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms <br /> of Service. To report copyright violations, e-mail copyright@aia.org. <br /> User Notes: (1279676012) <br />
The URL can be used to link to this page
Your browser does not support the video tag.