BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ A.2.2 Unless otherwise provided,the Contract Time is the period of time,including authorized adjustments,allotted in <br /> the Contract Documents for Substantial Completion of the Work.The Contract Time shall be measured from the date of <br /> commencement of the Work. <br /> § A.2.3 Substantial Completion <br /> § A.2.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents,the Construction <br /> Manager shall achieve Substantial Completion of the entire Work: <br /> (Check one of the following boxes and complete the necessary information.) <br /> [(< »] Not later than« »(z< »)calendar days from the date of commencement of the Work. <br /> [« »] By the following date:i< <br /> § A.2.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents,if portions of the Work <br /> are to be completed prior to Substantial Completion of the entire Work,the Construction Manager shall achieve <br /> Substantial Completion of such portions by the following dates: <br /> Portion of Work Substantial Completion Date <br /> § A.2.3.3 If the Construction Manager fails to achieve Substantial Completion as provided in this Section A.2.3, <br /> liquidated damages shall be assessed as follows: <br /> Construction Manager understands that if it fails to achieve Substantial Completion by the Substantial Completion Date <br /> (as specified in the GMP Amendment),Owner will suffer damages that are difficult to determine and accurately specify. <br /> Construction Manager agrees that if it fails to achieve Substantial Completion by the Substantial Completion Date, <br /> Construction Manager shall pay Owner as liquidated damages for each calendar day <br /> that Substantial Completion extends beyond the relevant Substantial Completion Date. <br /> Any liquidated damages assessed pursuant to this Contract shall be in lieu of all monetary liability for any and all extra <br /> costs,losses,expenses,claims,penalties and any other damages,whether special or consequential,and of whatsoever <br /> nature incurred by Owner which are caused by any delay in achieving Substantial Completion or Final Completion, <br /> provided this limitation shall not apply to Construction Manager's duty to indemnify the Owner or to warrant <br /> Construction Manager's Work as provided in this Contract and shall not apply to any loss,damage,cost or liability <br /> incurred by Owner due to factors unrelated to Construction Manager's delay. <br /> ARTICLE A.3 INFORMATION UPON WHICH AMENDMENT IS BASED <br /> § A.3.1 The Guaranteed Maximum Price and Contract Time set forth in this Amendment are based on the Contract <br /> Documents and the following: <br /> § A.3.1.1 The following Supplementary and other Conditions of the Contract: <br /> Document Title Date Pages <br /> § A.3.1.2 The following Specifications: <br /> (Either list the Specifications here, or refer to an exhibit attached to this Amendment.) <br /> « » <br /> Section Title Date Pages <br /> § A.3.1.3 The following Drawings: <br /> (Either list the Drawings here, or refer to an exhibit attached to this Amendment.) <br /> <( >' <br /> AIA Document A133'- 2019 Exhibit A. Copyright O 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. <br /> The "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are registered trademarks and may not be used 3 <br /> without permission. This draft was produced by AIA software at 14:22:51 ET on 09/16/2022 under Order No.2114304515 which expires on <br /> 03/23/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents° Terms <br /> of Service. To report copyright violations, e-mail copyright@aia.org. (1131696201) <br /> User Notes: <br />