Laserfiche WebLink
11111 <br /> Energy Code Notes <br /> 1. Contractor to add additional framing or blacking as required to meet current energy code <br /> requirements. <br /> 2. Air leakage;Sole plate is to be caulked and sealed. All holes in building envelope to be <br /> caulked including but not limited to electrical,plumbing,and HVAC penetrations. Rough <br /> opening around all windows and doors to be sealed and caulked. <br /> 3. All ceiling exhaust fan ducting to be insulated as per code and to have as few bends as <br /> possible and to terminate at the exterior of the building. <br /> 4. Exterior walls to be insulated with r- Floor to be r-3o. Attic to be r-38 blown in and <br /> installed in strict conformance witi manufactures recommendations for density and <br /> coverage also provide vent baffles and weather strip the attic access. All HVAC ducts <br /> installed outside the heated habitable space to have sealed joints, corners,and boots and <br /> insulated to a min.of r-8. <br /> 5. All recessed light fixtures in the thermal envelope to be certified under astm E-283 and so <br /> labeled,or sealed around the exterior in an approved manner to be tight. <br /> 6. All water pipes in unheated spaces to be insulated to a min.of r-3. <br /> 7. Windows and Glazing at a min.of U factor of o.30. <br /> 8. Shower head and faucets to be rated 1.75 gpm or less. Lay. Faucets to be to gpm or less. <br /> 9. Bathroom/Laundry exhaust fan to be 5o cfm. <br /> 10. Roof area ventilation is 896 sq.ft.x i/300=3 sq.ft.of ventilation area required. 7 turtle vents <br /> to be installed with 8x8 openings plus vented blocks at eaves. <br /> ii. All footings to bear on firm undisturbed soil. <br /> 12. During backfill operations,foundation wall shall not be unbalanced by more than 2 ft.on <br /> either side. <br /> 13. Trusses are to be pre-manufactured and engineered from the plant. <br /> FaSUED <br /> JUN 1 7 2022 <br /> CITY OF EVERETT <br /> Permit Services <br />