Laserfiche WebLink
• <br /> �ll 11 ' <br /> February 22,2022 <br /> [r� <br /> D � <br /> ' • <br /> Attn: Rakeeb Khan <br /> Project Address: .427 Bell Ave. Everett, WA MAR 1 4 2022 <br /> Subject: DADU Building Official Comments <br /> CITY 0 F E VE R E T7' <br /> Plan Check Number: B2109-047, First Building Review Permit Services <br /> To whom this may concern: <br /> At the request of Robert Smith Mac Donald this office reviewed the subject project to answer the building <br /> official comments.The following is our response to those comments: <br /> Structural <br /> 1. New construction is required for the retaining wall and bath/laundry room perimeter footing. Plan <br /> SA 1.1 is updated to clarify the construction at this area. <br /> 2. Dowels are specified as cold joints are anticipated between the new foundation wall and new <br /> 12x18"thickened slab edge. Plan SA 1.1 is updated to clarify this design intent. <br /> 3. Details 7/S3.0& l0/S3.0 are revised to clarify the 2x4 brace connections and location. <br /> 4. Detail 9/S3.0 is revised to clarify the outlooker requirements. <br /> 5. Page S l.OB is added with a nailing schedule. <br /> 6. Page S 1.0 is renamed to S 1.0A. The Foundation notes on S 1.0A are updated to reflect the design <br /> values. <br /> Please contact this office with any questions regarding this letter. CO V/� j <br /> p c, G, <br /> Sincerely, . L �tioF w�sy��c. 0 <br /> i ■� <br /> ''�o ��f48 � b� , <br /> S7ER <br /> .,,,,s!oN�.E,0C' <br /> FEB 2 2 2022 <br /> Jasper Baarbe, P.E. Chrhicovington, P.E. <br />