My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8831 CORBIN DR 2023-06-20
>
Address Records
>
CORBIN DR
>
8831
>
8831 CORBIN DR 2023-06-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 4:00:48 PM
Creation date
6/20/2023 3:49:55 PM
Metadata
Fields
Template:
Address Document
Street Name
CORBIN DR
Street Number
8831
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/22/2022 Page <br /> City of Everett <br /> 8:43:42AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. P2110-016 Site Address 8831 CORBIN DR <br /> Applied 10/13/2021 Applicant Busola Jimoh Lot <br /> Approved 10/14/2021 Owner Busola Jimoh Block <br /> Issued 10/19/2021 Contractor OWNER Tract <br /> Parent Permit No. BW2012-001 Description ADU Remodeling <br /> Notes **ADD HOSE BIB TO SCOPE** <br /> Scheduled Completed Tune Inspector Result Remarks Inspector's Comments <br /> 11/29/2021 11/29/2021 PLUMB JJM CORRECTION Busola 425-418-1732 <br /> 03-ROUGH IN <br /> (11/29/2021 12:43 PM JJM) <br /> -Grade 3"drains to 2%slope per UPC. <br /> -Add 3"end of the line clean out for under <br /> future vanity in furthest bathroom. <br /> -Add nail plates to protect drains through <br /> joists where wood is 11/4"or less. <br /> 12/1/2021 12/1/2021 PLUMB JJM CORRECTION (12/1/2021 1:17 PM JJM) <br /> 02-GROUND -Short section of 3"drain is still <br /> backgraded. <br /> 12/2/2021 12/2/2021 PLUMB JJM RESCHEDULE (12/2/2021 7:53 AM JJM) <br /> 02-GROUND -Customer is not ready for return <br /> inspection. <br /> 12/3/2021 12/3/2021 PLUMB JJM APPROVAL (12/3/2021 8:59 AM JJM) <br /> 02-GROUND -Underfloor DWV plumbing ok for cover. <br /> 2/11/2022 2/11/2022 PLUMB JJM CORRECTION Busola 425-418-1732 <br /> 03-ROUGH IN <br /> (2/11/2022 10:48 AM JJM) <br /> -Move AW hot and cold supply lines to <br /> inside of stud wall as close as possible to <br /> the heated envelope of the building to <br /> protect from freezing and heat loss in hot <br /> line per UPC. <br /> -Fix leak on tub shoe. <br /> -Replace plastic FIP type adapters on <br /> tub/shower valve with metal style adapters <br /> per UPC to prevent future cracking. <br /> -Install test plugs in shower riser and tub <br /> spout drop ears to test for leaks with valve <br /> turned on. <br /> 2/15/2022 2/15/2022 PLUMB JJM RESCHEDULE Busola 425-418-1732 <br /> 03-ROUGH IN <br /> 2/22/2022 2/22/2022 PLUMB JJM APPROVAL (2/18/2022 9:48 AM CRB) <br /> 03-ROUGH IN BJIMOH.BJ@GMAIL.COM <br /> 6/10/2022 6/10/2022 PLUMB 08-FINAL JJM CORRECTION (6/10/2022 9:55 AM JJM) <br /> -Install approved air gap fitting for DW <br /> drain connection.Per UPC 807.3 Domestic <br /> Dishwashing Machine <br /> -Install hammer arrester on DW supply <br /> stop per UPC 609.10 Water Hammer <br /> -Fix/replace leaking DW drain tube. <br /> -Replace PVC drain tube off t&p with <br /> CPVC all the way from valve to wall with <br /> approved CPVC glue per UPC. <br /> -Caulk toilet and shower escutcheon in <br /> main bath per UPC 402.2 Joints. <br /> 6/17/2022 6/17/2022 PLUMB 08-FINAL JJM APPRVD-PERK (6/15/2022 9:06 AM JSG) <br /> 425-418-1732 <br /> bjimoh.bj@gmail.com <br /> (6/17/2022 7:18 AM JJM) <br /> -Plumb final ok.New hosebib rough in ok. <br /> INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.