My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
710 91ST PL SE 2023-06-27
>
Address Records
>
91ST PL SE
>
710
>
710 91ST PL SE 2023-06-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2023 8:43:12 AM
Creation date
6/22/2023 6:10:52 AM
Metadata
Fields
Template:
Address Document
Street Name
91ST PL SE
Street Number
710
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lumio <br /> SMART ENERGY TODAY <br /> (SET) <br /> 1550 DIGITAL DR,LEHI,UT <br /> 84043,USA <br /> SYSTEM INFO <br /> (15)Q CELLS <br /> Q.PEAK DUO BLK ML-G10+ <br /> (400W) <br /> (15)ENPHASE <br /> IQ8PLUS-72-2-US(240V) <br /> DC SYSTEM SIZE:6.000 kWDC <br /> ,N SOLAR BONDING CONNECTION GROUND PATHS " ■ .;; SM SOLAR ENDCLAMP, FIRST MODULE : ■ AC SYSTEM SIZE:4.500kWAC <br /> ■� MOUNT INSTALLATION GUIDE PAGE ■■ MOUNT INSTALLATION GUIDE PAGE <br /> - <br /> ------_-------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------------------- <br /> REVISIONS <br /> 4 Aro t HGF�\� O © © I DESCRIPTION DATE REV <br /> 110a1<FFq� FR9MF © gpa SF-aF`ptE N rr% <br /> SF00 OoaOtHG T-0 ..�-. <br /> O't'O ROS Ol ra <br /> /Nc r GapMir <br /> PROJECT NAME&ADDRESS <br /> BONDING MIDCLAMP ASSEMBLY BONDING MIDCLAMP ASSEMBLY BONDING RAIL SPLICE BAR RAILTO L-FOOTw/BONDING T-BOLT INSTALL MODULE END CLAMPS:The End INSTALL END CLAMPS ON RAIL: POSITION END CLAMPS: NOTE:To assist insertion of clamp into <br /> Bonding Hardware creates bond between Solrce ©serrated flange no removes Lfoot anodizahon clamp is supplied as an assembly with a 1/2' Slide end clamp on to rail by Slide end clamp assembly rail slot,Pressure may be applied to <br /> ®Aluminum mid clamp with stainless steel bonding pins that pierce module frame Q bar and each rad secr.on to bond LFoot to stainless steel T-bon Q <br /> anodization to bond module to module through clamp hex head bolt that is accessible at the ends of engaging the two t-guide brackets on to rail until bolt head top or side of bracket as shown.Do t) <br /> Aluminum spike win spans across rail gap to Serrated T-bolt head penetrates ail anodization <br /> V create 11.1 to rail bond.Rail on at least one side grounded rails.The clamp should be installed on the with the top slot of the rails. engages with end of rail not force clamp into rail by pushing <br /> Stainless steel nut bonds aluminum damp to stainless steel T-bolt m Mord T-bolt.nut,and L-root ro <br /> of spike wnl be grounded SM rail rails prior to installing end modules. boU is extended as far as possiule End clamps are positioned on on bolt with excessive force <br /> Serrated T-bolt head penetrates rail anodization to bond T-bolt,nut,clamp,and - so that clamp is positioned at max, rails prior to the first end CI <br /> modules to SM rail distance from end of rail, module and prior to the Last C) <br /> end module. N <br /> Z 0CD <br /> Q O <br /> U E g >Q o <br /> .. hEXIItlrwrrAirtve .� _. - 2—► J > C14 <br /> WCA wAs1R.R 1 r I <br /> 4— - N-- r BONDING , ace o'°g a V o �b r, ' LU W O <br /> E D B r.eou EeF wigF Sir.: 1 U Z ~v C) <br /> A_ \\ U) nW/ <br /> Sn1iN BONDING BONDING RAIL \��O 1 i'\ W Il Q <br /> OUND �.7 MICROINVERTER SPLICE BAR ©' 0 <br /> ♦ MOUNT - _ ,� W W (� <br /> / — WEEBLUG(OR ILSCO LUG) ® W W CD <br /> ~1/2' Q <br /> LLI <br /> BONDING MICROINVERTER MOUNT RACK SYSTEM GROUND INSTALL FIRST MODULE: ENGAGE CLAMP:While holding module in position and with J U) Z <br /> 4 Mex nut with capt"tock washes ponds metal (�WEEB waShel dimples pies(!snodlred tall to Install the first end module flange in full contact with rail,rotate end clamp bolt until for hese appearance, J J <br /> microinverter flange to stainless steet T-bolt a create bond between rad and position module Rush 0— <br /> BONDING MiDCLAMv onto rails with the flange of clamp engages with flange to provide clamp force. with ends of rails.Rails > Q <br /> 4 tbnSerrated T-bolt head penetrates andduation <br /> ASSEMBLY - — ©Solid copper mreconneaedto lug isromedto the module frame positioned To ensure bolt is not over-torqued,use low torque setting should not extend more <br /> to bond T-Doll nut,and L-loot td grounded pyla hail s <br /> A C SM rail,,.- s m ystem ground connection. between end clamps an ends on drill or If using an impact driver,stop rotation as soon as �s than 1/2'beyond module. fn <br /> nWi,m.,�.ryv�sn�evn�un®f,m.n,n ter- l'iT:Ic.�q Wn.r•z ce,�:,nr.:e:..ww 1 Module must be fully <br /> RAILTO LFOOT .1 appco..d msnohwnran _iii.m�•rtu ��n��-ia.nT+s Nrfo of rails. impact action Of driver begins. supported by rails and <br /> wAONIi1NGT-B0LT m u jE VALUE(See t.._. r..; �;,l.. cannot overhang ends <br /> End clamp bolt to 5 ft-lbs.No anti-seize of rails. O <br /> r— <br /> DATE:9/7/2022 <br /> SHEET NAME <br /> EQUIPMENT <br /> LSPECIFICATIONS <br /> SHEET SIZE <br /> ANSI B <br /> 11" X 17" <br /> SHEET NUMBER <br /> PV-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.