My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2721 WETMORE AVE MARQUEE APARTMENTS 2023-06-28
>
Address Records
>
WETMORE AVE
>
2721
>
MARQUEE APARTMENTS
>
2721 WETMORE AVE MARQUEE APARTMENTS 2023-06-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2023 11:11:14 AM
Creation date
6/22/2023 9:57:45 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2721
Tenant Name
MARQUEE APARTMENTS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
544
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r • <br /> CT ENGINEERIING i 80 Nickerson <br /> N Suitt'302 <br /> sc„,11e, <br /> {)8109 <br /> August 7, 2019 {2.c)1�)2hs-•is1 <br /> 2. <br /> lax: 28S-0618 <br /> City of Everett <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> ATTN: Mr. Drew Martin <br /> RE: Marquee Apartments Everett Shoring <br /> 2721 Wetmore Avenue, Everett WA <br /> COE#PW1907-055 <br /> Response to First Building Review—Shoring. <br /> Dear Drew: <br /> We have received your review comments dated August 2, 2019 for the Marquee Apartments Everett <br /> Shoring project in Everett, WA. Below is our response to your comments regarding the structural <br /> shoring items and are numbered in the same manner as your correction notice. <br /> GEOTECHNICAL See additional response by the Geotechnical Engineer. The following is intended <br /> to clarify structural shoring calculations and design criteria. <br /> 1) Geotechnical Report and Addendums: See response by the geotechnical engineer. <br /> 2) Soil Nail Design Parameters: Confirming the Soil Nail design parameters presented in the <br /> geotechnical report were used for soil nail wall design. <br /> 3) Soil Nail Wall Surcharge Loading: with SnailZ software, all live loading: i.e. construction, traffic <br /> and adjacent building surcharge loading are input as maximum ASD vertical loading. See also <br /> response to item 4. <br /> 4) Soil Nail Wall Surcharge Loading: Surcharge loading is input into SnailZ software as ASD <br /> vertical loading. Please reference previously submitted soil nail calculations. The design loading <br /> was included in the calculations and also summarized in wall sections on Sheet SS4.1 for each <br /> location. This agrees with the minimum 250 psf minimum construction/traffic surcharge loading. <br /> In addition, the west wall was designed for 500 psf construction surcharge loading and verified for <br /> concrete pump truck outrigger loading. <br /> 5) Soil Nail Wall Surcharge Loading from Adjacent Buildings: As noted in response to Item 3 <br /> and 4 above, surcharge loading is input as vertical loading. In the previously submitted shoring <br /> calculations Page 79 of 180—South and Page 130 of 180- North the building weight per Square <br /> Foot and Wall weight per linear foot(including tributary live and dead and snow loading)are <br /> included in the vertical loading section of the subsequent soil nail runs. <br /> 6) Figure 3 vs. Design recommendations tor Vertical Elements and/or Corner Brace Vertical <br /> Element Piles: Design Parameters for Vertical Elements will be clarified in a supplemental letter <br /> by the Geotechnical Engineer. Design based on the passive pressure triangle loading is a <br /> "truncated triangle" per text of Figure 3 was confirmed with the geotechnical engineer. <br /> 7) Corner Brace at North-East Corner: To clarify, a corner brace was used in the north east <br /> corner due to an existing sanitary sewer line in the alley that is approximately 14 feet deep. The <br /> design for this corner brace is found in previously submitted calculations Page 121 to 124 of 180 <br /> following loading RE Figure 3 using Civil Tech pile design software. .RE Section 4/SS4.1 for <br /> design loading. <br /> 8) Vertical Elements: Reference previously submitted calculations and attached supplemental <br /> shoring calculations. Reference the boring logs which indicate shallow fill over very dense glacial <br /> soils over 50 blow count. VE piles are used for initial lift"belt and suspender"support of the <br /> existing building to get the initial lift of nails installed. As noted in response to Item 5 above, the <br /> Structural Engineers <br />
The URL can be used to link to this page
Your browser does not support the video tag.