Laserfiche WebLink
Envelope Summary ENV-SUM <br /> 2015 WSEC Compliance Forms for Commercial Buildings including R2,R3,&R4 over 3 stories and all R1 Revised Oct 2017 <br /> Project Info Project Title: Marquee Apartments Date 0 3/14/2 019 <br /> Applicant Info. <br /> Company Name: Berona Engineers,Inc. For Building Department Use <br /> Provide contact Company Address: 4630 200th St.SW Suite C,Lynnwood WA 98036 <br /> information for <br /> individual who can Applicant Name: Kathi Shoemake <br /> respond to inquiries <br /> about information Applicant Phone: (425)744-6033 <br /> provided. Applicant Email: kathis@beronaengineers.com <br /> Project Description New Building ❑ Addition ❑ Alteration ❑ No Envelope Scope <br /> Envelope Project Scope ❑ All Commercial ❑✓ Group R-CommerciL.J Mixed Use-Commercial+Group R <br /> Select all that apply. <br /> Semi-heated Refrigerated Cooler Refrigerated Freezer Equipment Building <br /> Envelope Description New building with 1 below grade parking garage. Street level floor has commercial <br /> Provide brief description of the project and spaces, residential lobby and parking garage. Floors 2 through 6 of residential <br /> relevant supporting documentation. apartments. <br /> If project includes multiple Target insulation <br /> Allowance areas,and/or is demonstrating <br /> compliance as an Addition+Existing, <br /> Alteration+Existing.or <br /> Addition+Alteration +Existing project, <br /> provide a brief summary of the approach to <br /> whole building compliance. <br /> Air Barrier Testing Air barrier testing per Section C402.5.1.2 included in project scope <br /> Air barrier testing is required for all new ❑ <br /> construction projects. Testing criteria is 0.40 Additional Efficiency Package Option-C406.9 Reduced Air Infiltration <br /> cfm/ft2 under test pressure of 0.3 inch w.g. ❑ <br /> To comply with C406.9,demonstrate that Testing not required. Explanation <br /> measured air leakage of building envelope <br /> Compliance Documentation Scope and Method <br /> Scope of This Calculation E New Building ❑ Addition ❑ Alteration ❑ No Envelope Scope <br /> Target Insulation Allowance 0 Fully Conditioned-Commercial,Group R,Mixed Use <br /> Sets the title and calculations in the <br /> O <br /> compliance forms. Selection required Semi-heated Refrigerated Cooler Refrigerated Freezer <br /> to enable forms. If project includes more than one Target Insulation Allowance area,and/or if project includes <br /> addition and alteration areas complying independently,for each area complete an ENV-SUM <br /> form Rows 16-46 and either an ENV-PRESCRIPTIVE form, or ENV-UA+ENV-SHGC forms if <br /> demonstrating compliance via component performance. <br /> Envelope Compliance Path O Prescriptive ® Component Performance <br /> Selection required to enable forms. <br /> Component Performance ❑ Change of Occupancy(C503.2)i Conditioning(C505)- 10%higher UA allowed <br /> Calculation Adjustments Additional Efficiency Package Option-C406.8 Enhanced Envelope- 15%lower UA required <br /> Additions O Addition stand alone O Addition+Existing <br /> Addition stand alone-Complete Vertical Fenestration and Skylight Area Calculation.Enter total existing-to-remain wall,roof, vertical <br /> fenestration and skylight areas as EXISTING. Enter total addition envelope assembly areas as NEW.If resulting total building WWR exceeds <br /> 30%and/or SSR exceeds 5%,refer to C502.2.I and C502.2.2 for prescriptive compliance alternatives.If complying via component <br /> performance,complete ENV-UA per instructions for addition stand alone projects. <br /> Addition+existing-Complete ENV-UA per instructions for addtion+existing projects. <br /> Alterations- ❑ Replacement windows only,or resulting ❑ Total building WWR increased by <br /> total building WWR<_original WWR <br /> Fenestration and Skylight <br /> ❑ Replacement skylights only,or resulting Total building SRR increased by alteration <br /> total building SRR_<original SRR <br /> WWR and SRR not increased-Vertical Fenestration and Skylight Area Calculation not required. <br /> WWR and/or SRR increased-Complete Vertical Fenestration and Skylight Area Calculation.Enter total existing-to-remain wall,roof, vertical <br /> fenestration and skylight areas as EXISTING. Enter total altered envelope assembly areas as NEW.If resulting total building WWR exceeds <br /> 30%and/or SSR exceeds 5%,refer to C503.3.2 and C503.3.3 for prescriptive compliance alternatives.If complying via component <br /> performance,complete ENV-UA per instructions for alteration+existing projects. <br />