Laserfiche WebLink
GENERAL STRUCTURAL NOTES ABBREVIATIONS SPECIAL INSPECTIONS SCHEDULE 5� ,:RF.. <br /> DESIGN CRITERIA HELICAL PILES AB ANCHOR BOLT FTG FOOTING <br /> CODE: 1. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED IN ACCORDANCE WITH THE 2018 INTERNATIONAL ABV ABOVE GA GAUGE SPECIAL INSPECTIONS TABLES PER THE 2018 IBC.ALL ITEMS NON-APPLICABLE ITEMS HAVE BEEN <br /> ROOF 25 PSF SNOW(GROUND) BUILDING CODE(IBC). AFF ABOVE FINISH FLOOR GALV GALVANIZED MARKED WITH A".ITEMS REQUIRING SPECIAL INSPECTION HAVE BEEN MARKED WITH AN'X'. •4 s/ONALF'� <br /> FLOORS 2. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED BY IDEAL MANUFACTURING,INC.,AND SHALL BE ALT ALTERNATE GLB GLULAM BEAM <br /> GR GRADE TABLE 1705.3 <br /> RESIDENTIAL 40 PSF IN ACCORDANCE WITH ESR-3750. ALUM ALUMINUM REQUIRED SPECIAL INSPECTIONS AND TESTS OF CONCRETE CONSTRUCTION <br /> BALCONY/DECK 60 PSF 3. ALL MATERIAL PROPERTIES OF HELICAL PILE COMPONENTS SHALL BE IN ACCORDANCE WITH ESR-3750. APPROX APPROXIMATE GYP GYPSUM WALL BOARD <br /> 4. CORROSION PROTECTION OF ALL PILE COMPONENTS SHALL COMPLY WITH THE ICC-ES ACCEPTANCE AYC ALASKAN YELLOW CEDAR HDG HOT-DIPPED GALVANIZED CONTINUOUS PERIODIC SPECIAL REFERENCED IBC <br /> TYPE SPECIAL INSPECTION STANDARD REFERENCE <br /> GENERAL CONDITIONS CRITERIA FOR CORROSION PROTECTION OF STEEL FOUNDATION SYSTEMS USING POLYMER(EAA) BB BOX BEAM HDR HEADER INSPECTION <br /> 1. THE CONTRACTOR SHALL EXAMINE THE STRUCTURAL DRAWINGS AND SHALL NOTIFY THE STRUCTURALBF BOTTOM FLUSH I-IF HEM FIR I.Inspect reinforcement,including preslressng - - ACI313 Cn.20,25.2. 19034 <br /> COATINGS(AQ228). tendons,and veiny placement. 25.3,265,1-26.53 <br /> ENGINEER OF ANY DISCREPANCIES HE MAY FIND BEFORE PROCEEDING WITH THE WORK. 5. ALL HELICAL FOUNDATION COMPONENTS SHALL BE GALVANICALLY ISOLATED FROM CONCRETE BLDG BUILDING HGT HEIGHT 2.Reinforcing bar welding: <br /> 2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS AND SITE CONDITIONS BEFORE BLKG BLOCKING HT HEIGHT a.oenrIhanAfy TMA7nforcOlg bars - - <br /> REINFORCING STEEL,BUILDING STRUCTURAL STEEL,OR ANY OTHER METAL BUILDING COMPONENTS PER other than A of elnrAWS o1.4 <br /> STARTING WORK.THE ARCHITECT/ENGINEER SHALL IMMEDIATELY BE NOTIFIED IN WRITING OF ANY AC358 SECTION 3.9. BM BEAM IN INCH 0.Inspectvngle-pass inlet welds.Inmanne ACI 318:26.5.4 - <br /> DISCREPANCIES. 6. THE SHAFT SHALL BE DESIGNED AND FABRICATED TO SUPPORT THE SPECIFIED DESIGN LOADS. HOT BOTTOM IT JOINT TIs'and <br /> BP BOTTOM PLATE c.Inspect all other welds. - - <br /> 3. ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE WORKING DRAWINGS SHALL 7. ONLY MANUFACTURER-APPROVED CONNECTORS,ADAPTORS,AND ACCESSORIES MAY BE USED. MAX MAXIMUM 3.Inspect anchors cast In concrete. - - a0 318:17.8.2 - <br /> BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE STRUCTURAL ENGINEER BEFORE 8. HELICAL PILES SHALL BE INSTALLED VERTICALLY INTO THE GROUND WITH AN ALLOWABLE ANGLE OF BRG BEARING MIN MINIMUM 4.Inspect encnons post-Installed in hardened <br /> PROCEEDING WITH ANY WORK SO INVOLVED. INCLINATION OF.1-1 DEGREE FROM VERTICAL PER SECTION 4.2.1 OF ESR-3750. BTWN BETWEEN MISC MISCELLANEOUS concrete members.' Q O. z <br /> BSMT BASEMENT a Adhesive anchors installed in horizontally ( t7 <br /> 4. IN CASE OF CONFLICT, NOTES AND DETAILS OF THESE STRUCTURAL DRAWINGS SHALL TAKE 9. MONITOR AND RECORD DEPTH OF PILE PENETRATION.PROVIDE TORQUE MONITORING DEVICE AS PART OF NB NON-BEARING or upwardly inclined orientations to resist - - ACI 318_17.8.2.4 - r <br /> B/W BOTTOM OF WALL Sustained tension bads. , Z O <br /> PRECEDENCE OVER THE"GENERAL NOTES"AND/OR"STANDARD DETAILS". THE INSTALLING UNIT.MONITOR AND RECORD TORQUE APPLIED DURING THE INSTALLATION OF EACH PILE NO NUMBER b.Mecnanihal anchors and adhesive anchors - _ L� <br /> CANT CANTILEVER notaeanedina.aT- LLl <br /> 5. IF A SPECIFIC DETAIL IS NOT SHOWN FOR ANY PART OF THE WORK,THE CONSTRUCTION SHALL BE THE AT SPECIFIC DEPTHS. OC ON CENTERW t7 <br /> CI CONTROL JOINT 5.Verityuse of regWred mn. - - ACI 318:Cn 19, 1904.L1904.2, z <br /> SAME AS FOR SIMILAR WORK. 10. HELICAL PILES SHALL BE INSTALLED TO THE MINIMUM TORQUE VALUE REQUIRED TO PROVIDE THE PSF POUNDS PER SQUARE FOOT design264.3,2644 1908.2,19063 5 <br /> CLG. CEILING 6,Prior to concrete placement,fabricate specimens ASTM 112 <br /> 6. WORKING DIMENSIONS SHALL NOT BE SCALED FROM PLANS, SECTIONS, OR DETAILS ON THESE MINIMUM REQUIRED LOAD CAPACITIES INDICATED ON PLAN INCLUDING A FACTOR OF SAFETY NO LESS PSI POUNDS PER SQUARE INCH for strength rats,perform slump one air <br /> CU CEILING JOIST - - ASTM C 31 1908.10 W Z <br /> DRAWINGS. THAN TWO(2).THE MAXIMUM INSTALLATION TORQUE SHALL NOT EXCEED THE ALLOWABLE TORSIONAL CLR CLEAR PT PRESSURE TREATED conthe tent <br /> tests,s and determine the temperature of ACI 318:26.45,2612 Z A <br /> e. <br /> 7. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT AND THE STRUCTURAL ENGINEER OF ANY CAPACITY OF ANY INDIVIDUAL COMPONENT OF THE PILE ASSEMBLY. CMU CONCRETE MASONRY UNIT RAF RAFTER 7.Inspect concrete and shotcrete pAcemect for - - ACI 318:26.45 1908,6.1908.7, 0 O <br /> CONDITION WHICH IN HIS OPINION MIGHT ENDANGER THE STABILITY OF THE STRUCTURE OR CAUSE 11. ALL BRACKETS AND HELICAL PILE ASSEMBLY COMPONENTS SHALL HAVE ADEQUATE CAPACITY TO ACHIEVE REF REFERENCE 8.VPMPety maiintnatce of specss. 1908.8 <br /> COL COLUMN 8.Venify maintenance of specified curing _ - ACI 318:26.4.7-264.9 1908.9 <br /> DISTRESS TO THE STRUCTURE. THE MINIMUM REQUIRED BEARING CAPACITY INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO(2). REINF REINFORCEMENT temperature and techniques. <br /> CONC CONCRETE 9.Inspect prestressed concrete for <br /> 8. THE CONTRACTOR SHALL SUPERVISE AND DIRECT HIS WORK AND HE SHALL BE SOLELY RESPONSIBLE 12. REPAIR BRACKETS MUST BE CONCENTRICALLY LOADED AND THE BRACKET PLATE MUST BE FULLY CONN CONNECTION REQD REQUIRED a.Application of prestressing forces:and - - Act 318:26.9.21 - <br /> FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SE UENCES AND PROCEDURES. PROVIDE ENGAGED WITH BOTTOM OF CONCRETE FOUNDATION. CONST CONSTRUCTION SF SQUARE FOOT b.Grouting of bonded restrssina tendons. _ _ ACI 318:26.9.2.3 <br /> Q Q 10.Inspect erection of precast concrete members. ACI 318:Ch.26.8 <br /> ADEQUATE SHORING AND BRACING OF ALL STRUCTURAL MEMBERS DURING CONSTRUCTION. 13. ALL HELICAL PILE ASSEMBLY COMPONENTS MUST HAVE ADEQUATE STRENGTH TO DEVELOP THE TORQUE CONT CONTINUOUS SIM SIMILAR 11.Verrty In-situ concrete strength,prior to stressing <br /> or tendons In post-tensioned concrete and ACI 318'26102 <br /> 9. ALL WORK SHALL CONFORM TO THE MINIMUM STANDARDS OF THE LATEST EDITION OF THE REQUIRED FOR INSTALLATION AND ALL INDUCED STRESSES. CTR CENTER SPF SPRUCE PINE FIR prior to,cs,wral or shores and foma from - - - - <br /> 14. THE PILE QUANTITY, AND SPACING INDICATED ON PLAN SHALL NOT BE CHANGED WITHOUT DET DETAIL STD STANDARD beams and stmcmal slabs. <br /> INTERNATIONAL BUILDING CODE,AND ALL OTHER REGULATING AGENCIES EXERCISING AUTHORITY OVER 12.Inspect lomraonr tor shape,location and <br /> ANY PORTION OF THE WORK. WRITTEN APPROVAL FROM THE ENGINEER-OF-RECORD PRIOR TO INSTALLATION. DF DOUGLAS FIR(SOUTH) SYP SOUTHERN YELLOW PINE dimensions of the concrete member being - - AD 318:26.10.1(0) - <br /> fommd. <br /> 10. SPECIFIC NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. 15. CONTINUOUS SPECIAL INSPECTION IN ACCORDANCE WITH 2018 AND 20121BC SECTION 1705.9 MUST BE DFL DOUGLAS FIR LARCH T/ TOP OF <br /> PROVIDED FOR THE INSTALLATION OF THE HELICAL PILES AND FOUNDATION BRACKETS.ITEMS TO BE DIM DIMENSION TABLE 1705.7 / <br /> WHERE THE NOTES,DRAWINGS,AND/OR SPECIFICATIONS DIFFER,THE MORE STRINGENT REQUIREMENT T/C TOP OF CONCRETE REQUIRED SPECIAL INSPECTIONS AND TESTS OF DRIVEN DEEP FOUNDATION ELEMENTS z/ <br /> RECORDED AND CONFIRMED BY THE SPECIAL INSPECTOR MUST INCLUDE THE FOLLOWING: DJ DOUBLE JOIST T/P TOP OF PLATE <br /> SHALL APPLY, DIA DIAMETER TYPE CONTINUOUS SPECIAL INSPECTION PERIODIC SPECIAL INSPECTION <br /> A. PRODUCT MANUFACTURER T S TOP OF STEEL - REVISIONS <br /> 11. REFER TO THE ARCHITECTURAL DRAWINGS FOR INFORMATION NOT COVERED BY THESE GENERAL NOTES / t.verily materials,sires and lengms<ompylsim <br /> B. MANUFACTURER'S CERTIFICATION OF THE INSTALLERS DN DOWN the requirements. - <br /> OR <br /> THE STRUCTURAL DRAWINGS. T/W TOP OF WALL :I % I t - i e <br /> 12. NOTIFY ENGINEER OF ALL FIELD CHANGES PRIOR TO INSTALLATION. C. PRODUCT TYPE AND CONFIGURATIONS FOR HELICAL PILE LEAD SHAFT SECTIONS,EXTENSIONS, DS DOWN SPOUT TF TOP FLUSH 2.Determine capacities or test elements and conduct x - - ! <br /> additional load tests.as required. <br /> BRACKETS,BOLTS,THREADED RODS,NUTS,WASHERS,AND TORQUES AS SPECIFIED IN THIS EA EACH 3.Inspect driving operations and maintain complete and x <br /> 13. DISCREPANCIES FOUND BETWEEN STRUCTURAL DRAWINGS AND OTHER DOCUMENTS ARE TO BE NOTED TJ TRIPLE JOIST accurate records nor each element. - <br /> SE EACH REPORT AND THE CONSTRUCTION DOCUMENTS 4.Verify pacement locations and piumbnness.confirm <br /> IN WRITING TO THE ENGINEER PRIOR TO CONSTRUCTION. T/BM TOP OF BEAM - <br /> D. INSTALLATION PROCEDURES FOR THE HELICAL PILE SHAFT,INSTALLATION EQUIPMENT USED,AND EXPANSION JOINT foot of <br /> penetration, <br /> Don,deer,recordrequired <br /> number netratio per <br /> 14. ALL CONSTRUCTION SHALL BE DONE WITH MATERIALS,METHODS,AND WORKMANSHIP ACCEPTED AS T/SLAB TOP OF SLAB root or tie sign can.cny.nine required penetrations to x - <br /> ELEV ELEVATION achieve record tip and butt elevations <br /> THE IDEAL FOUNDATION SYSTEMS INSTALLATION INSTRUCTIONS amens capacity. <br /> GOOD PRACTICE BY THE CONSTRUCTION INDUSTRY IN CONFORMANCE TO THE PROVISIONS OF THE EN EDGE NAILING(PANEL) TP TOP PLATE and document any damage to foundation element. <br /> E. ANTICIPATED AND ACTUAL PILING DEPTH 5.For steel elemeno,perform additional special - <br /> "INTERNATIONAL BUILDING CODE"(IBC),AND STANDARDS REFERENCED THEREIN. EQ EQUAL TYP TYPICAL Ins - <br /> F, REQUIRED TARGET INSTALLATION TORQUE OF PILES AND MINIMUM DEPTH OF INSTALLATION Q pections a accordance with Section 1705 z. <br /> 15. STRUCTURAL STABILITY OF ALL NEW AND EXISTING STRUCTURES DURING CONSTRUCTION SHALL BE ES EACH SIDE UNO UNLESS NOTED OTHERWISE 6.For concrete elements and concrete-mled elements, • <br /> G. INCLINATION AND POSITION OF PILES,TOP OF PILE EXTENSION IN FULL CONTACT WITH BRACKET, perform tests and additional specialInspectons In - - <br /> THE RESPONSIBILITY OF THE CONTRACTOR.THIS INCLUDES EXCAVATIONS,COLUMNS,EQUIPMENT EW EACH WAY UPA UNDER POST ABOVE accordance min Section 1ZgT S. <br /> LOADS,MATERIAL LOADS,AND OTHERS.OBSERVATIONS BY THE ENGINEER-OF-RECORD DO NOT TIGHTNESS OF ALL BOLTS AND EVIDENCE THAT THE PILE FOUNDATION SYSTEMS ARE INSTALLED FB FLUSH BEAM UWA UNDER WALL ABOVE 7.For specialty elements,perform adanional lnspecnons as BY AN APPROVED IDEAL FOUNDATION SYSTEMS INSTALLER, re determined by me registered design professional in - <br /> INCLUDE INSPECTIONS OF TEMPORARY LOADING AND STABILITY DURING CONSTRUCTION. FIN FINISH VERT VERTICAL sponsiNe charge. <br /> 16. PILES IMPROPERLY INSTALLED BECAUSE OF MISLOCATION,MISALIGNMENT,OR FAILURE TO MEET OTHER PROJECT NAME <br /> FL FLOOR VIF VERIFY IN FIELD ._._ _......................................._ <br /> SPECIFIED DESIGN/INSTALLATION CRITERIA ARE NOT ACCEPTABLE.ABANDON REJECTED PILES AND FLSHG FLASHING W/ WITH 827 GRAND AVE, <br /> INSTALL ADDITIONAL PILES AS REQUIRED. FND FOUNDATION WC WESTERN CEDAR EVERETT,WA 98201 <br /> FP FIREPLACE WP WATERPROOF <br /> CONCRETE ANCHORS HELICAL PILE PROOF TESTING <br /> Fi FOOT WWF WELDED WIRE FABRIC <br /> 1. ALL SPECIFIED CONCRETE ANCHORS SHALL BE SIMPSON STRONG TIE,HILTI,OR EQUIVALENT.SPECIAL <br /> THE CAPACITY OF THE INSTALLED PILES SHALL BE VERIFIED BY FIELD TESTING OF A MINIMUM THREE(3) PROJECT NUMBER <br /> INSPECTIONS REQUIRED. PERCENT OF PILES UP TO FIVE(5)PILES MAXIMUM(ONE(1)MINIMUM)IN ACCORDANCE WITH THE PROCEDURE <br /> S210419-1XR <br /> OUTLINED IN ASTM D1143 AND/OR THE 2018 INTERNATIONAL BUILDING CODE(IBC).THE MAXIMUM TEST LOAD <br /> STRUCTURAL AND MISC,STEEL SHALL BE TWO-HUNDRED(200)PERCENT OF THE SPECIFIED DESIGN LOAD. <br /> 1. REFERENCE STANDARDS:DESIGN,FABRICATION AND ERECTION ARE TO BE IN ACCORDANCE WITH THE DRAWN"c'-FY <br /> LATEST EDITION OF THE RISC"CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES". <br /> 2. MATERIALS: <br /> CHECKEDBY <br /> -MITT <br /> BOLTS-ASTM A307,UNLESS OTHERWISE NOTED <br /> WF BEAMS-ASTM A572-50(Fy=50,000 PSI) SHEET L - 06/14/2021 <br /> HSS ROUND COLUMNS-ASTM A500 Gr.B(Fy=42,000 PSI) ..............._____..._...........__._.- <br /> HSS RECTANGULAR COLUMNS-ASTM A500 Gr.B(Fy=46,000 PSI) SCALE <br /> ALL OTHER STEEL-ASTM A36(Fy=36,000 PSI) <br /> STRUCTURAL STEEL WELDING , <br /> 1. CONFORM TO THE AWS CODES D1.1 AND D1,3.,AND USE ONLY CERTIFIED WELDERS.WELDS NOT <br /> SPECIFIED ARE TO BE 1/4"CONTINUOUS FILLET MINIMUM.USE DRY E70 ELECTRODES. <br /> ALTERNATES: <br /> 1. ALTERNATE ASSEMBLIES AND MATERIALS WILL BE CONSIDERED FOR REVIEW.ENGINEER MAY REQUEST <br /> PAYMENT FOR REVIEW;CONTRACTOR WILL BEAR BURDEN FOR ADDITIONAL PAYMENT AT NO ADDITIONAL <br /> COST TO OWNER. I LA <br /> i LL <br /> F- <br /> JOBSITE SAFETY: I 0 <br /> 1. THE ENGINEER AND/OR ARCHITECT HAVE NOT BEEN RETAINED OR COMPENSATED TO PROVIDE DESIGN lZ <br /> AND/OR CONSTRUCTION REVIEW SERVICES RELATED TO THE CONTRACTOR'S SAFETY PRECAUTIONS OR '--1 <br /> TO MEANS,METHODS,TECHNIQUES,SEQUENCES OR PROCEDURES FOR THE CONTRACTOR TO PERFORM g <br /> HIS WORK.THE UNDERTAKING OF PERIODIC SITE VISITS BY THE ENGINEER AND/OR ARCHITECT SHALL <br /> NOT BE CONSTRUED AS SUPERVISION OF ACTUAL CONSTRUCTION NOR MAKE HIM RESPONSIBLE FOR (- <br /> PROVIDING A SAFE PLACE FOR THE PERFORMANCE OF WORK BY THE CONTRACTOR,SUBCONTRACTORS, n <br /> a SUPPLIERS OR THEIR EMPLOYEES,OR FOR ACCESS,VISITS,USE,WORK,TRAVEL,OR OCCUPANCY BY ANY <br /> I- <br /> PERSON. <br /> CITY OF EVERETT -J <br /> REVIEWED FOR PERMIT z <br /> 1 c(.9'3 W <br /> y, <br />