Laserfiche WebLink
D II II <br /> (E)WOOD FRAMED E—c9 W <br /> FLOOR SYSTEM, p?a :�sa"0R <br /> FIELD VERIFY Et'0 ,� s " �r <br /> I� •" ;,1;/fie: <br /> •.SrontA1-E. <br /> • <br /> I <br /> T/STEM WALL= I <br /> WOOD POST PER <br /> • 8"MIN THICKNESS, M® FIELD VERIFY ' �PNNLp0ATTNEE qq <br /> CONTRACTOR TO VERIFY T/FIN GRADE_� (4)#4 VERTS, SIMPSO'V CB66 <br /> r',1=IIIi=IIIi=IIIi—`III_ II=Iil=1 =IIIi= VARIES (1)@ EA IIIi POST BASE[NOTE <br /> —IIIi—IIIiIIIi111E-1n IIII-1111II 111= <br /> mm—In=ml M n1= CORNER 2 1,-la—IIII_im 11 — =11 IIIi (E)CONC STEM WALL o % <br /> -1111-11_ml 1n 111=nl . .,, .11=pi —1111 rl— =H = -_ . <br /> r1-6"SQ x 1'-2"DPi 11I=Ii=II=IIII=IIIi=111 III ' I -IIIi=II—IIIi=III, (E)CONC , o=O} I_ 1= 11 i=u11I HIT: I 11 1FIIi 1 --I _;: CONC PILE CAP[NOTE OTEL SLAB-ON-GRAD U . <br /> LI C .111=IIIi-IIIi-IIIi III III]=III , IIIi IIIi IIi=IIIi= <br /> Wz ji m1 11 III 11 11 Ia 1111111 iI EAIIIN c s T/GONG SQG= }j n1 1111 1Il7iI i 1 11 111 111 11I 1Iiaiii <br /> z o II 1111 irii 111 I H m nH—II=mm ° . M FIELD VERIFY 'T a <br /> Cij 601- Elio mI n -1111 1 II =m I ° H11 p11 H11= r , 1 LU <br /> U li IIIi III IIIi I III—f1— ' , •II IIIi IIIi=IIII=111, , -ESL F z D z oN _n1_n11_li11=II1_i L1 =HI Im_n11E11HNIn1=I T/CONCFIG- <br /> =111I=III_n1=1u- a=IHl=un= =III=1111=1 III =IIIi=!11=11111111 �- W <br /> _iii1=111-111E-11 IT1=Im=111 FIELD VERIFY 1I=1111= 17 ° I /1TI=1111L1111=111 to z <br /> _Ili=1i11=nii HE-1i11E1i11= 1111 11RIIll'• o ' ' a=IIIi t In1- - 0 w a <br /> '=1111=m1=11 1111=1i11_m WEDGE ANCHORS _1111=I111= - R ' • • 111 1141(1= W z( <br /> '=nn-nn 11=11°=111= PER STABIL-LOC _ 1 - " _ _ Z <br /> IIII=IIII=111 - — = U '-1111.7 I =1111=�1=11 1 0 ZO w=lln—ml --�1=nH=nr REQUIREMENTS '11=I111=III—II,--_III IIIi-1111E_IIIi=111I_111I <br /> .-_Igi=i_luu�Ii1 `,a iii i k-_-Hn=11a `�' .,,,III. I IIIi= 1=_1111=_111=1111=11'- <br /> (E)CONTINUOUS -""_"'-' 11I=" -III IIIIi1,:IIIi-1111-IIIi=1' <br /> Iuh� 2 #4 HORZJ <br /> CONC FOOTING O -IIIi= —nil—u— IDEAL HELICAL PILE&NEW <br /> TOP&BOTTO III-'III nll- CONSTRUCTION BRACKET PER <br /> NOTES: ,�, STABIL-LOC CONCENTRIC PIER M EA WAY / _2;-0" / R&R FOUNDATION SPECIALIST <br /> 1.CONTRACTOR TO VERIFY NOTED MINIMUM EXISTING FOUNDATION ASSEMBLY PER R&R FOUNDATION TO CONFORM TO ESR-3750 <br /> DIMENSIONS PRIOR TO INSTALLATION.ENGINEER-OF-RECORD TO BE ii <br /> NOTIFIED PRIOR TO INSTALLATION IF MINIMUMS NOT MET. II SPECIALIST TO CONFORM TO ESR-4121 NOTES: <br /> 2.ALL ASSEMBLY COMPONENTS SHALL BE FULLY SEALED BY A <br /> CORROSION RESISTANT SYSTEM.THIS INCLUDES ALL FINAL CUT fl 1. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF fc=2,500PSI. <br /> ENDS AND DRILLED HOLES.CORROSION PREVENTION COATING 2. COLUMN FASTENER QUANTITY AND SIZE PER SIMPSON STRONG-TIE. <br /> SYSTEM BY OTHERS.PRIME AND PAINT PER MFR OR GALVANIZATION <br /> PERASTM153/A123. I3 3. MINIMUM COLUMN BASE EMBEDMENT DEPTH PER ESR-3050. <br /> 3.AT CUT INSTALLATION POCKET ALL EXPOSED STEEL <br /> CORROSION. <br /> EMENT SHALL BE SEALED ORC ATEDTOPREVENT I RECOLONIZED D IN AN ICC-ES EVALUATION REPORT.NGINEERED LUMBER AlREVISIONS-ill <br /> I MEMBERS MUST BE EITHER SAWN OR <br /> - <br /> REINFORCEMENT <br /> 1 CONCENTRIC/DRIVEN PILE INSTALLATION DETAIL 2 HELICAL PILE WITH PILE CAP INSTALLATION DETAIL 3 NOT USED <br /> PROJECT NAME <br /> 827 GRAND AVE, <br /> EVERETT,WA 98201 <br /> 5210419-1 XR <br /> FY <br /> .KEUBY-MRT <br /> "ATE-06/14/2021 <br /> SCALE <br /> J <br /> Q <br /> I— <br /> W <br /> 0 <br /> z <br /> 0 <br /> CITY OF EVERETT <br /> PERMIT <br /> 4 NOT USED 5 NOT USED 6 NOT USEDIEED I=®R 0 <br />