My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/06/21 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/06/21 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 12:26:13 PM
Creation date
6/22/2023 10:16:44 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Interstate <br />1. I-5 / Downtown Everett Interchange Access Improvements <br />(Everett Ave. Hewitt Ave., US 2, Pacific Ave) <br />2. I-5 / 100th Street SE HOV Access/Undercrossing <br />3. NB Everett Mall Way / SB I-5 Onramp <br />4. 1-5 / Smith Island Interchange (I-5 & SR 529 <br />5. 1-5 NB HOT/ Lane (US 2 to SR 528) <br />6. I-5 / East Marine View Drive Interchange Improvements <br />7. 1-5 / 128th Street Interchange <br />8. I-5 / 128th Street HOV Ramps (Mariner Park & Ride) <br />9. 1-5 / 112th Street Interchange Study <br />Freeways <br />1. US 2 Improvements (SR 204 to 1-5) <br />2. SR 526 Corridor I/gp ovements <br />3. SR 526 Extension (I-5 to US 2) <br />4. SR 526/Evergreen Way Interchange <br />5. SR 529/Smith Island Ramps <br />6. SR 526/40th Avenue W. Intersection Improvements <br />Principal Arterials <br />1. W. Marine View Dr./Rucker/41 st Freight Route Improvements <br />2. Broadway Corridor Improvements (SR 526 to SR 529) <br />3. SE Everett Mall Way (SR 99 to SR 526) <br />4. Arterial Safety Projects <br />5. Evergreen Way Improvements (41 st St. to Gibson Road) <br />6. Evergreen \Vay Streetscape Improvements <br />7. I-5 to Port of Everett Truck Route <br />8. Mukilteo Blvd. Safety Imp. (Friday Ave. to City Limits) <br />9 Arterial Needs Study <br />10. Edgewater Creek Bridge Replacement <br />11. Merrill & Ring Creek Bridge Replacement <br />12. Marshland Bridge Replacement <br />Minor Arterials <br />1. 116th Street SE Street Improvements (SR 527 to 35th) <br />2. 100th Street SW Street Improvements (4th Ave. W. to Airport) <br />3. Casino Rd. Safety Improvements (Evergreen to 5th Ave.) <br />4. 4th Avenue West Improvements (104th to 112th) <br />5. 100th Street SE Improvements (SR 527 to 7th Ave SE) <br />6. 100th Street SE Improvements (7th Ave to Evergreen) <br />7. 110th Street SE Improvements (SR 527 to 35th St.) <br />8. Lenora St./Lowell-River Rd./BNSF Rail Line Xing <br />9. Minor Arterial Streetscape Improvements <br />Collector Arterials <br />1. East Everett Avenue/BNSF Overcrossing <br />2. Bond Street Ped/Bike Improvements. (Kromer to Terminal) <br />3. Chestnut St. /Eclipse Mill Road. Improvements (Pacific to 36th) <br />4. Silver Lake Road - 121st Street SE Ped. Improvements <br />5. 37th Street Improvements (Rucker to Broadway) <br />6. Collector Arterial Streetscape Improvements <br />High Capacity Transit <br />1. Light Rail - Lynnwood to Everett Extension <br />2. Light Rail Stations <br />3. HCT Support Program <br />Local Access and Other Projects <br />1. BNSF RR safety improvements <br />2. Local roadway safety projects <br />3. Safe routes to schools <br />Local Access and Other Projects (continued) <br />1. Bridge Rehabilitation Program <br />2. Annual Pavement Maintenance Program <br />3. Sidewalk repair and replacement <br />(Safety) <br />(Safety) <br />(Safety) <br />(Maintenance) <br />(\'laintenance) <br />(Maintenance) <br />Pavement marking projects (Maintenance) <br />1. 106th Place SE Improvements <br />2. 3rd Avenue SE Improvements <br />3. Local Street Improvements <br />4. Upper & Lower Ridge Rd. Improvements <br />5. Riverfront Site Access Improvements <br />Downtown Streetscape Improvements <br />1. Traffic Signal Central System <br />2. Traffic Signal Interconnect <br />3. Traffic Signal Improvements <br />Traffic Sign Improvements <br />1. Neighborhood Block Grants <br />2. Neighborhood Traffic Studies/Project <br />3. Residential Sidewalks <br />(Street) <br />(Street) <br />(Street) <br />(Street) <br />(Street) <br />(Street) <br />(Traffic Signals) <br />(Traffic Signals) <br />(Traffic Signals) <br />(Traffic Signals) <br />(Neighborhoods) <br />(Neighborhoods) <br />(Neighborhoods) <br />Non -Motorized Trail/Path Improvements <br />1. Smith Island Bike and Pedestrian Improvements <br />2. Bicycle Master Plan Implementation <br />3. California Street Bicycle Pedestrian Corridor <br />4. Fleming St. Bicycle Corridor <br />5. Fulton St. Bicycle Pedestrian Corridor <br />6. N. Broadway Pedestrian Bridge <br />7. 75th St. SW (Hardeson Rd. to Seaway Blvd.) <br />8. Riverside Bus Pk. Ped. Trail (16th to N. Broadway) <br />9 West/East Marine View Drive Bike-Ped Improvements <br />10. 47th Street Ped Improvements (Evgreen to Black Forest Lane) <br />11. Pigeon Creek No. 1 /BNSF Rail Line Crossing <br />12. Grand Avenue/North Marina Ped-Bike Connection <br />13. Shoreline Access Imp. (Various Locations) <br />14. Pigeon Creek Rd. No. 1 Improvements <br />15. Everett Non -motorized Projects (Various Locations in Everett) <br />16. Lowell Snohomish River Road. Bike/Ped Connection <br />17. Riverfront District Bike/Ped Paths <br />18. Interurban Trail Bike/Ped Path Improvements <br />19. Bicycle Detection Signals <br />20. ADA Signals (Accessible Pedestrian Signals (APS)) <br />21. ADA Ramps <br />22. Waterfront Place Esplanade <br />Transit <br />1. Bus Replacements 2023- 2028 <br />2. Implementation of State CTR Law <br />3. Everett Station Repair and Updates <br />4. Operations Base Relocation and Construction <br />5. Safety and Security Enhancements <br />6. On Board ITS replacement & upgrade <br />7. Service Planning & Development Software/Hardware <br />8. Next Generation ORCA Project Cost Share w/ region <br />9 Next Generation ORCA Project Hardware Installation <br />10. Alternative to fixed route demonstration <br />11. Replace Vehicle Wash System <br />12. Replace Vehicle maintenance facility <br />13. Generator <br />14. Inductive Charging Infrastructure <br />15. Electronic Signage (EVST/College/Mall) <br />16. Infotainment on buses <br />17. Shelter Replacement <br />18. Everett Station HVAC <br />19. Energy Collection Storage <br />Port - Marine Industrial Transportation Improvements <br />1. Marine Terminals Maintenance and Expansion <br />2. Harbor and Snohomish River Federal Navigation Channel <br />Improvements <br />3. SR 529 (W. Marine View Drive) Bulkhead <br />Rehabilitation <br />ENTRIES IN BOLD ARE NEW TO 2024-2029 TIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.