My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/06/21 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/06/21 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 12:26:13 PM
Creation date
6/22/2023 10:16:44 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br />FINAL CONTRACT VOUCHER CERTIFICATION <br />DATE: March 31, 2023 <br />CONTRACTOR: American Process Group, LLC. <br />PROJECT TITLE: 2022 Biosolids Removal and Disposal <br />DATE WORK COMPLETE: September 23rd, 2022 <br />ADDRESS: 1201 Pacific Ave., Suite 600 <br />CITY/STATE: Tacoma, WA 98402 <br />WORK ORDER NO. UT 3752-30 <br />FINAL AMOUNT: $1,450,233.92 <br />Inclusive of Washington State Sales Tax <br />CONTRACTOR'S CERTIFICATION <br />I, the undersigned, having first been duly sworn, certify that the attached bill is a char e for <br />proper g work <br />performed and material furnished to the City of Everett, that the same or anypart thereof has not <br />been <br />paid, and that I am authorized to sign for the claimant; that I have not rented orpurchased anyequipment • q pment <br />or materials from any employee of the City; I further certify that the attached final estimate is a true and <br />correct statement showing all the monies due me from the City of Everett under this contract; that I have <br />carefully examined said final estimate and understand the same and that I herebyrelease the it <br />Everett from anyand all claims City of <br />of whatsoever nature which I may have, arising out of the performance of <br />said coact, which are not set forth in said estimate. <br />X <br />CONTRACTOR <br />American Process Group, LLC. <br />Subscribe • _ - - worn to before me this <br />x <br />Province of Alberta, Canada <br />In a� =e-of W sh gte 7 residing at <br />Barrister & Solicitor <br />A Commissioner for Oaths and Notary Public <br />In and for the Province of Alberta <br />My Commission Expires at His Majesty's Pleasure <br />PUBLIC WORKS DEPARTMENT CERTIFICATION <br />X General Manager <br />TITLE <br />a•-+ day of 4-QRIL <br />��- aoal3 � �'° <br />sPazucts &2.bua Art -FAj <br />I Certify the attached final estimate to be <br />based upon actual measurements and to <br />be true and correct. <br />X <br />Associate Engineer <br />Hanna Lintukorpi <br />APPROVED Date: <br />X <br />Public? Iorks Director <br />Ryan Sass <br />• <br />INSTRUCTIONS <br />The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, <br />agents andand all <br />subcontractor's <br />forwarded with the Final Contract Voucher Certification. Contractor's Claims, if <br />any, must be included and the Contractor's Certification must be labeled indicating a claim attached. <br />Revised 6/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.