Subsurface Exploration, Geologic Hazard,and <br /> 2721 Wetmore Preliminary Geotechnical Engineering Report <br /> Everett, Washington Preliminary Design Recommendations <br /> Caving could be experienced when excavating and installing lagging between piles. <br /> Overexcavation of soils should be avoided. Excavation should extend just far enough to allow <br /> lagging installation. Any void spaces behind lagging should be quickly identified and filled with <br /> pea gravel or other suitable free-draining material to prevent caving and loss of support for <br /> adjacent ground. <br /> Since the soldier pile wall system will also be designed as a permanent structural element for <br /> the proposed development, we recommend that corrosion protection be used for the structural <br /> elements of the wall designed to act as permanent structures. Corrosion protection <br /> requirements should be specified by the structural engineer. We also recommend that the <br /> seismic surcharges incorporated into the design of the permanent foundation elements of the <br /> development also be incorporated into the design of the wall structures planned as permanent <br /> structures. Drainage should be provided as recommended in this report. <br /> Due to its depth, the proposed excavation may require multiple rows of tieback anchors on <br /> three sides (west, north, and south). For multiple rows of tiebacks, a preliminary design <br /> pressure in the form of an "apparent" earth pressure distribution is recommended. We <br /> recommend an apparent earth pressure of 25(H+2) psf presented as a trapezoidal distribution <br /> where H is the retained excavation depth. The top of the distribution should be truncated from <br /> no pressure at the ground surface to full pressure at a depth of 10 feet. Refer to Figure 4 for <br /> additional design details and a graphic representation of the recommended apparent earth <br /> pressures. The apparent pressure distribution should be assumed to act over the tributary area <br /> of the piles above the excavation base and one concreted pile diameter below the base. The <br /> recommended earth pressure reflects surcharging from "normal" construction equipment and <br /> activities, as well as the variability of the site soils. A traffic surcharge equivalent to 2 feet of <br /> soil has been incorporated into the design-apparent earth pressures and is reflected in the H+2 <br /> portion of the apparent earth pressure. The use of apparent earth pressure for the shoring <br /> system assumes some minor deformation of the soil will occur. Typically, deformation on the <br /> order of 0.001 to 0.002 times the height of the excavation is possible. This could result in <br /> deflections on the order of about 0.25 to 0.5 inches for a 20-foot-tall wall. Theoretically, an <br /> equal amount of settlement occurs behind the wall. The settlement is typically greatest <br /> immediately adjacent to the wall and decreases with distance away from the wall. The limits of <br /> settlement are typically within a distance of one-half to one wall height behind the top of wall. <br /> Therefore, a comprehensive survey of the surrounding streets, structures, and other critical <br /> reference points should be performed prior to construction activities. These points should then <br /> be accurately monitored, as necessary, both horizontally and vertically, until the permanent <br /> walls and floors have been completed in the excavation. <br /> From a soil standpoint, the grouted soldier piles must be designed for sufficient vertical <br /> capacity, and should include the vertical component-of the inclined tieback loads. It should be <br /> noted that settlement of the soldier piles under load could also cause a reduction in anchor <br /> May 28,2019 ASSOCIATED EARTH SCIENCES, INC. <br /> FSM/Id-190168E001-2-Projects\20190168\KE\WP Page 17 <br />