My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2606 HARRISON AVE 2023-06-22
>
Address Records
>
HARRISON AVE
>
2606
>
2606 HARRISON AVE 2023-06-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2023 11:14:22 AM
Creation date
6/22/2023 11:14:02 AM
Metadata
Fields
Template:
Address Document
Street Name
HARRISON AVE
Street Number
2606
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 410 <br /> 75:17P4ETT <br /> (425)257-8810 <br /> Plan Check No.: B1708-027 <br /> Application Date: 8/18/2017 <br /> -� Tenant: [TenName] <br /> r:-- <br /> `yam"-' Owner: AVILEZ-PINA MARIA/AYALA-MANZANO <br /> G.j .;�na�-"'I x�ire <br /> - c <br /> AZAEL <br /> CO co. <br /> •.� <br /> ice• 9 4$t <br /> Ce: '-"' Job Address: 2606 HARRISON AVE <br /> Proposed Use: SFR <br /> yca u c- Description of Work: REPLACE FIRE DAMAGED ROOF <br /> tin Plan Check Fee Paid: $81.41 <br /> r c^ C <br /> z L p.2CJc. <br /> 17,1 <br /> t-- <br /> Tile building permit application for the above-referenced project is being conditionally accepted for filing <br /> pending the determination of its completeness. <br /> If the City review determines that any additional land use approval or any additional information is <br /> required to complete your building permit application,it will be necessary to submit this additional <br /> information or acquire the additional land use approval prior to your application being considered complete <br /> for filing.If no other land use approval or additional information is required,your building permit <br /> application will be considered filed as of this date. Plan review fees are estimates. Final plan review fees <br /> will be calculated at permit issuance. <br /> BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br /> WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br /> exrf I — 17 <br /> Signature Date <br /> FILE COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.