My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7130 HIGHLAND DR 2023-06-22
>
Address Records
>
HIGHLAND DR
>
7130
>
7130 HIGHLAND DR 2023-06-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2023 11:24:01 AM
Creation date
6/22/2023 11:23:48 AM
Metadata
Fields
Template:
Address Document
Street Name
HIGHLAND DR
Street Number
7130
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intake &Approval Sheet (FOR PERMIT STAFF ONLY) PERMIT#3�,���O°� I Yam'S vas <br /> BUILDING • •LANNING <br /> -Intake OK by: Date: V 31ZOP7 Intake OK by: Assign To: Date: <br /> Intake Comments: 5 ny� P"Ajy Intake Comments: <br /> kkil *1 n/I I vl._ Zone rL'� <br /> Overlay/Agreement <br /> ❑ Route to Commercial Building Nonresidential Use <br /> ❑ Route to Residential Building Residential Use . H't qv'. .1 Nui" <br /> ❑ Make this a"W" Permit Proposed No. of Dwelling Units: <br /> Bldg/TI/Addn/Rem Size Total No.of Dwelling Units: j <br /> Garage/Accessory Struct.Size Planning/Landscape Inspection Required before Final? DYes ❑No <br /> Number of Stories "In Lieu" Fee: Type: Amount$ <br /> Basement ❑No ❑Yes , Fin/Unfin School Impact Fee: Total $ <br /> Type of Construction Calculated: Credit: <br /> Occupancy Group ❑Everett School Dist ❑Mukilteo School Dist <br /> Occupancy Load Park Impact Fees for permits lied for after 1/1/2022: <br /> Fire Sprinklers: ❑Update Existing ❑New System ❑Not Req'd Park Impact Fee Total$ (net due after credit for existing uses) <br /> Reason Sprinklers Required: Fee Schedule Used Calculation(Year): <br /> Fire Alarm: ❑Update Existing El New System ❑Not Req'd Permit Techn' an Use Only:Apply Phase-In Credit Per EMC19.53.200 <br /> Reason Fire Alarm Required: 0 100%Credit-Issued 1/1/2022-9/2/2022 <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes ❑ No 0 50%Credit-Issued 9/3/2022-6/2/2023 <br /> Add'I RCW 64.55 docs required prior to final? ❑Yes No ❑ 0%Credit-Issued 6/3/2023 or later <br /> VALUATION CALCULATION: Total$ Additional Notes: No <br /> Approved By: vV4 Date: 2 8- <br /> • PUBLIC WORKS <br /> Additional Notes: Intake OK by: Date: <br /> Intake Comments: PW Worksheet Needed if: <br /> OSys Dev Eval(UtiuSvv)❑Traffic Mit Eval <br /> Approved By: v Date: / l j o 5 OSite Work/Drainage DAddress Letter <br /> ❑Backflow Prevention for high hazard: <br /> (dental,medical,animals,mortuary,hospital, <br /> FIRE DEPARTMENT supportive housing) <br /> Separate/Deferred Submittals Required: DRoute this folder for PW Review at end ---PW Review Worksheet <br /> ❑Fire Sprinklers ❑Fire Alarm ❑Other: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND ❑Create Green Folder ❑Submitted Previously ODeferred <br /> ❑This Permit is Approved by Public Works <br /> Fire Dept.Fees: ❑ See PW Review Worksheet and associated attached items <br /> ❑ Review of As-Built Plans-NO FIRE FEE 0 A Separate PW Permit is Required(Permit#:PW <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE AND ❑ Is located in this folder <br /> El in a Separate Green Folder(join with this folder for permit issuance) <br /> El Review/Inspection Scope-ADD FIRE FEE <br /> Approved By: Date: 0 Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> ❑ Public Works has no scope---PW Not Required <br /> ELECTRICAL/PLUMBING Additional Notes: <br /> Additional Notes: <br /> Approved By: Date: Completed By: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.