Laserfiche WebLink
Permit Inspections <br /> E V E R E T T City of Everett <br /> WASHINGTON <br /> 8/18/2022 8/18/2022 PERMIT EXTENSION AUDREY ARBOW EXTENSION <br /> (Reason Required) APPROVED <br /> Notes: <br /> Name:LaceyStandley <br /> Address:13350 41st Ave NE <br /> City,State,Zip:Marysville,WA 98271 <br /> Phone:4253096380 <br /> Comments:We need to re-open or re-activate permit E2002-029.Who would I speak with about this or contact?I am the office manager for Blue Sky <br /> Electrical <br /> 12/2/2022 12/2/2022 ELEC 10-FINAL MICHAEL CORRECTION eTRAKiT Inspection Request <br /> WICKLANDER REQUIRED <br /> Notes: <br /> 12/1/2022 11:38 AM BLUESKY ELECTRICAL CTN/DSN LLC <br /> keybox code:0066,side basement door on garage side of the house <br /> Contact Name:BLUESKY ELECTRICAL CTN/DSN LLC <br /> Site Address:3031 KROMER AVE <br /> Phone:4253096380 <br /> e-Mail:bluesky@blueskypnw.com <br /> Inspector SKB changed the inspection assignment from SKB to MHW <br /> Inspector MHW changed the inspection assignment from MHW to MHW <br /> Inspector MHW changed the inspection assignment from MHW to MHW <br /> Basement receptacles in inoperative;dining room receptacles inoperative,top floor bathroom receptacles are required to be GFCI.PER article 16 of the <br /> Everett building code,the electrical must be brought to up to current code when a whole house rewiring project is accomplished(living room <br /> w/fireplace north wall has no receptacles). <br /> Plumbing and mechanical permits must be signed off prior to electrical rough in/final <br /> 3/28/2023 3/28/2023 ELEC 10-FINAL MICHAEL APPRVD-PERMIT as noted <br /> WICKLANDER FINAL <br /> Notes: <br /> 3/27/2023 9:16 AM BLUESKY ELECTRICAL CTN/DSN LLC <br /> call brian to schedule access at 425-891-2698 <br /> Contact Name:BLUESKY ELECTRICAL CTN/DSN LLC <br /> Site Address:3031 KROMER AVE <br /> Phone:4253096380 <br /> e-Mail:bluesky@blueskypnw.com <br /> Corrections made.According to Chris Hill,project manager for Paul Davis construction,none of the main plumbing infrastructure was altered or <br /> changed.only finish parts/or components. <br /> Printed:Wednesday,29 March,2023 ( 2 of 2 <br /> SUPERION <br />