My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4918 24TH AVE W 2023-06-22
>
Address Records
>
24TH AVE W
>
4918
>
4918 24TH AVE W 2023-06-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2023 1:58:55 PM
Creation date
6/22/2023 1:52:06 PM
Metadata
Fields
Template:
Address Document
Street Name
24TH AVE W
Street Number
4918
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> SWPPP ELEMENTS <br /> 1 - PRESERVE VEGETATION/MARK CLEARING LIMITS <br /> The land disturbance activities for development requires the consideration to be given to <br /> minimize the removal of existing trees, disturbance and compaction of native soils, except <br /> as needed for building purposes. The duff layer,native soil and vegetation shall be retained <br /> in an undisturbed state to the minimum degree practicable. <br /> Best Management Practices (BMPs) to be used: <br /> • BMP C 103: High Visibility Fence <br /> 2-ESTABLISH CONSTRUCTION ACCESS <br /> The existing paved area will serve as the construction entrance. <br /> Best Management Practices (BMPs)to be used: <br /> • None required <br /> 3-CONTROL FLOW RATES <br /> Flow rates will be controlled by using SWPPP Element #4, sediment controls. <br /> 4-INSTALL SEDIMENT CONTROLS <br /> Due to the permeability of the site soils, surface flows from the site are expected to be <br /> negligible and therefore no sediment controls are needed. If the contractor notices that <br /> dirty storm water is leaving the site, then the contractor shall place silt fencing down slope <br /> from the disturbed areas as shown on the SWPPP. <br /> Best Management Practices (BMPs)to be used: <br /> • <br /> • BMP C 103: High Visibility Fence <br /> S-STABILIZED SOILS <br /> We do not expect any stockpiles on this project. All new exposed areas are expected to be <br /> covered with sand or building within 48 hours of exposure. <br /> If required, all exposed soil and any soil stockpile will be stabilized. The soil stockpile <br /> will be located within the disturbed area shown on the SWPPP plan. Any stockpiles will <br /> be covered in plastic if left un-worked. No soils shall remain exposed and unworked for <br /> more than 2 days between October 1 and April 30. Any land disturbed areas outside of the <br /> proposed horse arena will be permanently seeded. <br /> Best Management Practices (BMPs)to be used: <br />
The URL can be used to link to this page
Your browser does not support the video tag.