Laserfiche WebLink
3/5 <br /> • • <br /> a. 4x4 Pt or asphalt shingle, <br /> b. DF or HF#2, <br /> c. A34 will be replaced with ABA44Z for 4x4 post and ABA66Z for 6x6. <br /> d. (4) 10d nails are called out for both top and bottom of the nailer to the beam and <br /> post. Detail updated. <br /> 29. Deferred statement(roof trusses) to be added to Structural general notes:Note to <br /> include in general structural notes..Engineer-of-record to review the deferred truss <br /> submittals and verify conformance with the construction documents per IBC. <br /> We have made numerous revisions and updates in response to the extensive Structural <br /> comments dated July 29, 2021 . Thank you for noting some oversight and missing <br /> information which will help avoid field errors and confusion. We believe the contractor is <br /> well versed in the code and licensed and competent to make reasonable decisions. If <br /> questions or clarity is needed we are available to facilitate resolution. A reasonable <br /> perspective would conclude that not every code and reference would be necessary on the <br /> plans. However those regarding specific and significant design decisions or depiction <br /> might warrant more detail. <br /> Submitted by, 0 ( )`'t <br /> Alt <br /> oz. <br /> Dan Parrent, PE <br /> / 4 w <br /> -tom' / <br />