My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4918 24TH AVE W 2023-06-22
>
Address Records
>
24TH AVE W
>
4918
>
4918 24TH AVE W 2023-06-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2023 1:58:55 PM
Creation date
6/22/2023 1:52:06 PM
Metadata
Fields
Template:
Address Document
Street Name
24TH AVE W
Street Number
4918
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dc.cuSig.i Envelope ID: 14A43E24-9433-4A70-9 7B2B010272 • <br /> NM PUBLIC WORKS DEPARTMENT /�Q� <br /> Utilities Division,3200 Cedar Street 7;1 O' t7 ' <br /> Everett WA 98201 <br /> E V E R E T T 425-257-8800 <br /> WASHINGTON COST EST INIATE SIIELT <br /> Receipt # D.to Paid <br /> X Cost of Work Order $880.00 t <br /> Cost of Service Order k,Q er i e Order <br /> Requested By: Thad Newport C41, / 24922 <br /> Contact Person Mallorie Hefley p0I'07�r Sc' hon: 60 631-5922 x3 <br /> Email Address: mallorie@fullwilerconstruction.com I�ttl�i 444t, 12-7-2021 <br /> Property Owner(name) 4900 24th Ave W LLC <br /> Charge Cost to(name if different than owner) Attn: Mallorie Hefley <br /> Address 526 N.West Ave#147 City Arlington, WA Zip 98223 <br /> Installation Location U "A 1 t EL- giQi. . <br /> Installation type/description/size/etc. Modify existing service from 2" to 1". City crew to remove <br /> existing 2" meter and setter then install 1" setter and meter. City will reuse existing meter box. <br /> This estimate is for of .3 61 io I pWt l'f stvvi <br /> ❑ The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs, the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Signed Cost Estimate sheet must be sent to PermitServices@EverettWA.gov to move forward. <br /> *Permit must be paid prior to ordering parts or scheduling work. <br /> *Must have valid Public Works Permit before work can be performed. <br /> WATER METERS 4"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> cc: PermitServices@EverettWA.gov <br /> Material $714.00 Matt Welborn-Email&HC <br /> Labor and Benefits $79.00 Randy Allen-Email <br /> Jim Spooner-HC <br /> Equipment Rental $45.00 <br /> Sabrina Good-Email <br /> Tax $42.00 Grant Moen-Email <br /> Thad Newport-Email <br /> Restoration Terri Jorgenson-Email <br /> TOTAL $880.00 <br /> Prepared by: t—chignsibisconer /"'i J Date Estimate Prepared 1-12-2022 <br /> . f <br /> Accepted by: AtAL.briG AtittAiRepresenting Fullwiler construction Inc. <br /> MallorAie54Hefley <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> S:1#Common\clerical\Cost.est12022\49I8 24th Ave W I inch CEFP �\ <br /> 124:3 /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.