Laserfiche WebLink
$4811jT 1.888.251.5276 <br /> Bellingham i Arlington!Oak Harbor <br /> vwAMgeotest-inc.com <br /> October 8, 2021 <br /> Project No. 21-0845 <br /> Fullwiler Construction Inc. <br /> 526 N. West Avenue, Suite 147 <br /> Arlington, WA 98223 <br /> Attn.: Ms. Mallorie Hefley <br /> Regarding: Geotechnical Engineering Report <br /> Proposed Short Plat <br /> 2405 Hillside Lane <br /> Everett, WA 98203 <br /> Dear Ms. Hefley, <br /> As requested, GeoTest Services, Inc. [GeoTest] is pleased to submit the following report summarizing <br /> the results of our geotechnical engineering evaluation for the proposed short plat at the above <br /> referenced address in Everett,WA(see Vicinity Map, Figure 1).This report has been prepared in general <br /> accordance with the terms and conditions established in our services agreement dated September 3, <br /> 2021 and authorized by yourself. <br /> GeoTest appreciates the opportunity to provide geotechnical services on this project and look forward <br /> to assisting you during the construction phase. Should you have any further questions regarding the <br /> information contained within the report, or if we may be of service in other regards, please contact the <br /> undersigned. <br /> Respectfully, <br /> GeoTest Services, Inc. <br /> P00A. GA <br /> WAS '9 <br /> r• <br /> 01101dgiLLL" ‘. Ji <br /> 40812 <br /> FS, OISAL �0 <br /> S <br /> N <br /> Dave Trudeau Edwardo Garcia, P.E. <br /> Staff Geologist Geotechnical Department Manager <br /> Enclosure: Geotechnical Engineering Report <br />