Laserfiche WebLink
Terra Vista NW i i, Stormwater Management Report <br /> 5-Onsite Stormwater Management <br /> Does the entire project qualify as Flow Control exempt(per MR#7)?1 <br /> i <br /> Yes No <br /> ir <br /> Did the project developer choose to meet Does the project trigger <br /> No <br /> the LID Performance Standard? only MRs#1 -#5?(Per (the project triggers Is the project outside <br /> the Project Thresholds in MRs#1 -#9) the UGA on a parcel <br /> No Applicability of the that is 5 acres or larger? <br /> Minimum Requirements <br /> Yes Section). <br /> REQUIRED: For each <br /> surface,consider the BMPs 6.9":10 <br /> in the order listed in List#3 No <br /> for that type of surface.Use <br /> the first BMP that is Did the project <br /> considered feasible. developer choose to <br /> meet the LID —II Yes <br /> NOT REQUIRED: Performance Did the project <br /> Achievement of the LID Standard? developer choose to <br /> Performance Standard. No meet the LID <br /> Performance <br /> Standard? <br /> Yes Yes <br /> REQUIRED:For each <br /> surface,consider the No <br /> BMPs in the order <br /> Fisted in List#1 for tha <br /> type of surface.Use <br /> the first BMP that i <br /> T-onidered feasih'r <br /> NOT REQUIRED: <br /> Achievement of the Li <br /> Performance Standarc <br /> 11 <br /> --1 REQUIRED: Meet the LID <br /> REQUIRED: Meet the LID Performance REQUIRED:For each Performance Standard through <br /> Standard through the use of any Flow Control surface,consider the BMPs the use of any Flow Control <br /> BMP(s)in this manual. in the order listed in List#2 BMP(s)in this manual. <br /> for that type of surface.Use <br /> REQUIRED:Apply BMP T5.13 Post the first BMP that is REQUIRED:Apply BMP T5.13 <br /> Construction Soil Quality and Death. considered feasible. Post-Construction Soil Quality <br /> and Depth. <br /> NOT REQUIRED:Applying the BMPs in Lists NOT REQUIRED: <br /> #1,#2,or#3. Achievement of the LID NOT REQUIRED:Applying the <br /> Performance Standard. BMPs in Lists#1,#2,or#3. <br /> � <br /> ��'°131111 Flow Chart f1111 <br /> or Determining MR #5 <br /> Requirements <br /> Revised March 2019 <br /> Wa <br /> DEPARTMENT OF <br /> ECOLOGYPlease see http://www.ecy.wa.gov/copyright.html for copyright notice including permissions, <br /> State of Washington limitation of liability,and disclaimer. <br /> (210314)4900-2 Everett Page 6 May 19,2021 <br />