Laserfiche WebLink
, r <br /> im <br /> Permit Inspections <br /> VERETT City of Everett <br /> WASHINGTON <br /> BLDG 12- <br /> 8/11/2022 8/11/2022 INSULATION KURT KECK APPROVAL eTRAKiT Inspection Request <br /> Notes: <br /> 8/9/2022 7:50 AM FULLWILER CONSTRUCTION INC <br /> Contact Name:FULLWILER CONSTRUCTION INC <br /> Site Address:4920 24TH AVE W <br /> Phone:4253454234 <br /> e-Mail:ben@fullwilerconstruction.com <br /> 8/17/2022 8/17/2022 BLDG 10-DRYWALL KURT KECK NOT READY eTRAKiT Inspection Request <br /> NAILING <br /> Notes: <br /> 8/13/2022 8:41 AM FULLWILER CONSTRUCTION INC <br /> Contact Name:Ben McKinlay <br /> Site Address:4920 24th Ave SE Everett,WA 98201 <br /> Phone:4253454234 <br /> e-Mail:ben@fullwilerconstruction.com <br /> (8/17/2022 12:29 PM KMK) <br /> See fire Marshall's note on request for tenting inspection. <br /> 10/6/2022 10/6/2022 COVENANT KELSEY HEYD APPROVAL geo covenants recorded <br /> Notes: <br /> 3/20/2023 3/20/2023 BLDG 16-FINAL KURT KECK CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 3/14/2023 1:04 PM FULLWILER CONSTRUCTION INC <br /> (425)531-5703 <br /> Contact Name:FULLWILER CONSTRUCTION INC <br /> Site Address:4920 24TH AVE W <br /> Phone:3606315922 <br /> e-Mail:nate@fullwilerconstruction.com <br /> Complete electrical finals. <br /> Reschedule building final when ready. <br /> Note:Blower door test it attached <br /> 3/28/2023 3/28/2023 BLDG 16-FINAL KURT KECK APPRVD-PERMIT eTRAKiT Inspection Request <br /> FINAL <br /> Notes: <br /> 3/27/2023 11:53 AM FULLWILER CONSTRUCTION INC <br /> Contact Name:Nate Williams <br /> Site Address:19419 95th Avenue Northeast <br /> Phone:3606315922 <br /> e-Mail:willnat5@isu.edu <br /> Rescheduled to from 3/29 to 3/28. <br /> Printed:Wednesday,26 April,2023 (4-of 5 l r- <br /> / SUPERION <br />